ibus plc.
Transport Solutions
ibus plc. Transport Solutions M7 Originating Limerick 1 X - - PowerPoint PPT Presentation
ibus plc. Transport Solutions M7 Originating Limerick 1 X Executive Coach 1-2 Departures Daily Destination ibus Terminus South-HUB 1 Serving Kerry/Clare/Limerick/M7 Corridor 50 Operators 50 passengers daily [6
ibus plc.
Transport Solutions
M7
Originating Limerick 1 X Executive Coach 1-2 Departures Daily Destination ibus Terminus South-HUB 1 Serving Kerry/Clare/Limerick/M7 Corridor 50 Operators 50 passengers daily [6 passengers per week per operator]
M8
Originating Cork 1X Executive Coach 1 Departure Daily
Destination ibus Terminus South
Serving Cork/Tipperary/Laois M8 Corridor 50 Operators 50 passengers daily [6 passengers per week per operator]
M9
Originating Waterford 1 X Executive Coach 1-2 Departures Daily Destination ibus Terminus South
Serving Waterford/Kilkenny/CarlowM9 Corridor
50 Operators 50 passengers daily [6 passengers per operator per week]
ibus Terminus South – Hub 1
6 X Executive Mini/Midi Coaches I Hourly services*
Beaumont / Cappagh / National Re-Hab unit.
*Initially, services will only coincide with demand as per M7/M8/M9 outcomes.
HUB 1
Park & Ride
500 cars on “ground floor” development. Planning will include multi-storey.
along M7/M8/M9 Corridors.
* Or as demand requires
HUB 1
15 acres Minimal initial construction to include:
facilities.
complimentary refreshments etc.
Tasks
Buildings
Planning Applications Route Development IT Infrastructure [ticketing/web development] Professional Fees:- Architect, Accountancy, Legal, Logistics, PR…. Staff. General Manager Fleet
Processes & Timetable
Sign lease for site at M7 = 6 months Develop minimum facilities = 6 months Develop routes and timetables M7/M8/M9 = now Develop routes and timetables Capital City services=now Secure funding: Development-Livery-Working Capital = now
ibus Terminus South-[Funding]
HUB 1-M7 ……………how it works!
100km + rate 17 single/20.00 return per passenger nationwide 100km = 10 single/12.50 return nationwide
[ Ave 6 passengers per operator per week] 1 journey per day per coach per corridor
Note: Costs based on 1 trip per day per coach, any additional journeys involve fuel and driver
costs only and would dramatically improve overall performance
Costs:Buses & Coaches-275,000
3 X Executive Coaches @ 250,000 = 750,000 6XMidi/Mini Bus/Coaches @ 125,000 = 750,000 Total = 1,500,000 Annual Financing Cost over 7 years = 275,000
Costs:Staff-515,000
Wages: Drivers X 9 @ 35,000 315,000 General Manager/support staff 200,000 Total = 515,000
Fuel Costs-470,000
TOTAL= 940,000kms pa @ 3kms p/litre = 313,333 litres of fuel @ 1.50
Costs: Establishment-515,000
Building Costs: 750,000 X 15 years = 70,000 [15 years] Rent/Rates/: =35,000pa /Light/Heating/Maintenance: =25,000pa Insurance [Motor-Bond-Pensions] =35,000pa
IT infrastructure: =100,000
Professional Fees: =250,000 [once off]
Total =515,000
National Network of Private Hire Services
Incomes
Passengers from Corridors Passengers at Hub Lease Properties Advertising
Profit & Loss Year 1.
Costs12 months operations 1,775,000 Income:
Corridor Fares @ 17 per dayX50X312x3 795,600 Hub Fares @ 7 per day x 150 days x100 Park & Ride 218,400 Lease fees @ Zero Advertising @ Zero
Total Income 1,013,000
Profit & Loss: Year 2
[Corridors stet/Hub plus 100 passengers plus 212 days operations Leases 25,000]
Profit & Loss year 3
[Increase of 1 passenger per corridor to 51-increase of 100 passengers at Hub to 300]
Loss 35,000
Years 4-7
accumulated Losses will read 1,200,000
through the trading years.
way.
equalling investment of 5,000 per shareholder
What is in it for me?
Shareholding in major Irish passenger transport company. Synergies associated with major purchaser of fuel 2.5m
Opportunities for other major contracts, including, School Transport contract. Association of 500 fellow operators with single goal and self interest. Local feeder services to network/possible satellite route development. Access to professional help and future technologies in transport.
Bottom Line!
see Information Memorandum
Outcomes
1,500 shareholding-value at year 5 est. @ 7,500 [No dividend expected in 1st 7 years] 1,500 Preference Shares yield of 7.5% = 112.50 2,000 Performance Shares*
These represent the “hire” aspect of the ibus network of services and carry a phased yield based on the number of passengers presented to the network by each operator as follows: 0-7=0, 8-10 yield @ 5% or 100, 11-15 yield @ 10% or 200.
The flat rated highly competitive fare structure on the network presents opportunity for
here that if the minimum numbers, average of 7 passengers per week per operator, are not met then the Performance Share may become an annual cost based on the lower number. Example-the achieved annual numbers are the average of 4 = 860 in next year or 43%
ibus plc
Of