On BML: The oxen are slow, but the Earth is patient. A sponsor s - - PowerPoint PPT Presentation

on bml the oxen are slow but the earth is patient
SMART_READER_LITE
LIVE PREVIEW

On BML: The oxen are slow, but the Earth is patient. A sponsor s - - PowerPoint PPT Presentation

U.S .S. . ARMY On BML: The oxen are slow, but the Earth is patient. A sponsor s perspective on BML development and application Dr. Amy E. Henninger Technical Advisor, Center for Army Analysis Controlling UGVs in Boston U.S .S.


slide-1
SLIDE 1

U.S .S. . ARMY

On BML: “The oxen are slow, but the Earth is patient.”

A sponsor’s perspective on BML development and application

  • Dr. Amy E. Henninger

Technical Advisor, Center for Army Analysis

slide-2
SLIDE 2

U.S .S. . ARMY

Controlling UGVs in Boston…

l Never use the turn signal: it

gives away your plan to the enemy

l In making a left turn from the

right lane, employ shock and awe tactics, to maximally stun the other drivers

l Never, ever, stop for a

pedestrian unless he flings himself under the wheels of your car

l Honk your horn at cars within

10.3 ms of a stoplight changing

  • colors. NOTE: the actual color
  • f the stoplight is NOT significant

l Above all, keep moving and

when in doubt, accelerate

l 6 inches of snow is a "dusting“ l “Khaki's” are something you

start the car with

l “Subway” is a fast food place.

The transportation system is known as the "T", and only the "T”

l You can take the “T” to “JP” l “Holly” is an excellent WICKED

motorcycle

l Just hearing the words "New

York" puts you in a foul mood!!!

8 April 2011 2

Complicated Intent Recognition Complicated Language

slide-3
SLIDE 3

U.S .S. . ARMY

My Questions for You…

l What *is* BML? l What is the Use Case? l Who is the Customer?

8 April 2011 3

Now

BML R&D M&S C2

Future

BML

We

slide-4
SLIDE 4

U.S .S. . ARMY

Phase 3 Future

AMSO

MSDE BML Plug in Enhanced BML Orders MSDL Standard C-BML Standard Phase I Draft Phase 2 Future NATO OPORD V5.1 V5.0 Intl. Data Interop. V6.0 Tech Activity Proposal Program of Work Experiments Operational Demo

AMSO Projects

AMSO11- MSD-052

Current Project Proposed / Future

Legend: ¡ V7.0+ Harmonized

FY11 FY11 FY12 FY13 FY10 FY11 FY12 FY13

Application Integrated Updates

AMSO’s Near Term BML Plan

C

8 April 2011 4

Align existing US programs and projects to demonstrate the value / impact of SISO C-BML in a simulated operational environment (TRL-6) via MSG-085 in 2013

slide-5
SLIDE 5

U.S .S. . ARMY

BML Mid Term: Army’s Common Operating Environment

8 April 2011 5

slide-6
SLIDE 6

U.S .S. . ARMY

BML in DoD Standards’ Registries

8 April 2011 6

Path to standardization is very important to us

slide-7
SLIDE 7

U.S .S. . ARMY

BML: A Target

7

  • E. Integrating

across architectures

  • D. Integrating

within an architecture

  • B. Extending

and integrating semantically

  • A. Work that

surrounds simulation

  • C. Integrating

with C4I

8 April 2011

Acceptance by C2 Community is very important to us

slide-8
SLIDE 8

U.S .S. . ARMY

New ¡Zealand ¡

BML Around the World

Australia ¡ USA ¡

United ¡Kingdom ¡

Canada ¡

Italy ¡ Spain ¡ Netherlands ¡ Sweden ¡ Germany ¡ France ¡ Belgium ¡

MSG-­‑085 ¡ (Observer) ¡

Australia ¡

BML in Support of COA Analysis; Naval Experiments

Norway ¡

BML Toward Command Staff Trainers BML R&D C2-Sim Experiments with FR and Staff Training Experiments Complete BML Roadmap and Experimentation Program for C2-Sim BML Toward Command Staff Trainer Unmanned Surface Vehicle Range of Applications – C2-Sim, Maritime Applications, tasking games such as VBS2 Numerous SIMCI Projects, current integration in OneSAF, and Synchronization with JFCOM Coalition Battle Management Services (CBMS) Experimenting with C2 of UAV

Adoption of STANAG is very important to us

slide-9
SLIDE 9

U.S .S. . ARMY

BML: Past, Present, Future

Now 2020 Maturity R&D Real Applications Scope M&S Only C2 and M&S products Readiness TRL 3-6 TRL 7-9 Standardization Phase I DRAFT Implementable SISO Standard Payoff Assumed Benefits Demonstrated ROI Cooperation Collaborative Research NATO STANAG

8 April 2011 9

What Policies / Programs do we need for 2020?  in only 9 years (!) We need a Campaign Plan!

2003 ¡ 2013 ¡ 2020 ¡

slide-10
SLIDE 10

U.S .S. . ARMY

Futuristic

  • Thin client / Ipad-like device
  • Current situation C2 / intel

displayed / updated real time

  • With a swipe! –> simulate options

(COA analysis); results displayed

  • Commander selects for

execution / order including robotic forces – UAV, ground vehicles and some yet to be conceived

  • Progress tracked / deviations from

COA (with continuing reports)

  • Updated continuously / warnings

provided

  • Updated COA calculated

displayed

  • Commander selects and executes
  • Same interface C2 / Sim

8 April 2011 10

slide-11
SLIDE 11

U.S .S. . ARMY

Closing Challenges

l Are there lessons learned that can be applied to

current C-BML standardization efforts?

l How can we identify and overcome roadblocks to

industry acceptance?

l How can we engage or better involve BC / C2

communities or other potential user communities?

8 April 2011

C-BML