Preliminary Plans WIS 78 TO US 12 WIS 19 Dane County Public - - PowerPoint PPT Presentation

preliminary plans
SMART_READER_LITE
LIVE PREVIEW

Preliminary Plans WIS 78 TO US 12 WIS 19 Dane County Public - - PowerPoint PPT Presentation

Project 5145-00-01/71 Preliminary Plans WIS 78 TO US 12 WIS 19 Dane County Public Involvement Meeting July 19, 2018 1 Welcome and Opening Remarks William Strobel, PE Preliminary Plans WisDOT Project Development Supervisor Lalitha


slide-1
SLIDE 1

Project 5145-00-01/71 WIS 78 TO US 12 WIS 19 Dane County

Public Involvement Meeting July 19, 2018

1

Preliminary Plans

slide-2
SLIDE 2

Welcome and Opening Remarks

Lalitha Balachandran, PE WisDOT Project Manager Greg Payne, PE WisDOT Project Leader William Strobel, PE WisDOT Project Development Supervisor Jeremy Rach WisDOT Design Engineer

2 2

Preliminary Plans

slide-3
SLIDE 3

Agenda

  • Project Location
  • Recent Activities
  • Project Purpose/Need
  • Design Overview
  • Upcoming Schedule
  • Other Discussion – Questions?

3

Preliminary Plans

slide-4
SLIDE 4

Project Location

4

Preliminary Plans

slide-5
SLIDE 5

5

  • Anticipated Construction 2022
  • WIS 19 will be closed to thru traffic
  • Open for local, business and park

access

Preliminary Plans

slide-6
SLIDE 6

Recent Activity

6

  • 2013 – Archaeology investigation began
  • 2015 – WisDOT maintenance requested an emergency

lane edge improvement

  • 2017 – Lane edge improvement project was constructed

Preliminary Plans

slide-7
SLIDE 7

Recent Activity

7

  • 2017 continued
  • Design for the current project began
  • Project flown for surface survey data
  • Archaeology investigation continued
  • Existing drainage investigation
  • Traffic forecast completed
  • 2018
  • Archaeology investigation completed
  • Preliminary impacts completed
  • Began drafting environmental report

Preliminary Plans

slide-8
SLIDE 8

Project Purpose and Need

8

  • Safety Concerns
  • Blind vertical and horizontal curves leading to crash

concerns

  • Narrow shoulder width
  • Ditches are not traversable
  • Drainage Concerns
  • Deteriorating Surface
  • Bridges in Need of Replacement

Preliminary Plans

slide-9
SLIDE 9

Design Overview

  • Project Overview

9

Resurface CTH F Reconstruct Resurface Reconstruct Resurface CTH K Reconstruct Resurface

Preliminary Plans

slide-10
SLIDE 10

Design Overview

  • Rehabilitation Project
  • 35% Reconstruct / 65% Resurface
  • Geometric adjustments to improve safety
  • Widening of shoulders for length of the project
  • Improve drainage capability with new ditching
  • Cost vs. Benefit consideration

10

Preliminary Plans

slide-11
SLIDE 11

Design Overview

  • Existing Typical Section

11

Preliminary Plans

slide-12
SLIDE 12

Design Overview

  • Proposed Typical Section

12

Preliminary Plans

slide-13
SLIDE 13

Design Overview

  • Benefits of Wider Shoulders
  • Provides more space for farm equipment and other
  • versized loads
  • Increased safety for those deciding to pass these

vehicles

  • Increased safety for cars turning left or right
  • Increased safety for bicyclists, pedestrians and

motorists.

  • Provides a safe area for broken down cars to pull over
  • Provides a safe area for police to pull over speeding

motorists

13

Preliminary Plans

slide-14
SLIDE 14

Design Overview

  • WIS 78/WIS 19 Intersection

14

Resurface Reconstruct

Preliminary Plans

slide-15
SLIDE 15

15

Preliminary Plans

slide-16
SLIDE 16

Design Overview

  • Vertical and Horizontal Improvements Near CTH F

CTH F

16

Reconstruct Resurface

Preliminary Plans

slide-17
SLIDE 17

Design Overview

  • Marxville Reconstruct

CTH KP

17

Resurface Reconstruct

Preliminary Plans

slide-18
SLIDE 18

Design Overview

  • Horizontal Improvements Near Indian Lake Park

18

Lilac Lane Indian Lake Park Resurface Reconstruct

Preliminary Plans

slide-19
SLIDE 19

Design Overview

  • Horizontal Improvements Near Indian Lake Park

19

BEFORE AFTER

Preliminary Plans

slide-20
SLIDE 20

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

20

Matz Rd Resurface Reconstruct

Preliminary Plans

slide-21
SLIDE 21

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

21

BEFORE

Preliminary Plans

slide-22
SLIDE 22

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

22

AFTER

Preliminary Plans

slide-23
SLIDE 23

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

23

Matz Rd Resurface Reconstruct

Preliminary Plans

slide-24
SLIDE 24

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

24

BEFORE

Preliminary Plans

slide-25
SLIDE 25

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

25

AFTER 7-FEET

Preliminary Plans

slide-26
SLIDE 26

Design Overview

  • Vertical, Horizontal, and Drainage Improvements

26

Matz Rd Resurface Reconstruct

Preliminary Plans

slide-27
SLIDE 27

27

Preliminary Plans

slide-28
SLIDE 28

Design Overview

  • Horizontal Curve Improvement and Pedestrian Underpass

28

Resurface Reconstruct

Preliminary Plans

slide-29
SLIDE 29

Design Overview

  • WIS 19/US 12 Intersection

29

Resurface Reconstruct

Preliminary Plans

slide-30
SLIDE 30

Upcoming Schedule

  • Soil Testing
  • Environmental Report Submittal
  • Survey, Plat
  • Public Involvement Meeting #2
  • Real Estate Acquisition
  • Final Plans
  • Construction

30

Fall 2018 February 2019 May 2019 Tentatively May 2019 Fall 2019 May 2021 Spring 2022

Preliminary Plans

slide-31
SLIDE 31
  • Drain Tile Locations
  • Septic Tank Locations
  • Drainage Issues
  • Sensitive Installations, Trees, or Heirlooms

31

Preliminary Plans

slide-32
SLIDE 32

32

STEP 1 – Place number on the map. STEP 2 – Write number and comment

  • n form.

12

Preliminary Plans

slide-33
SLIDE 33

33

Preliminary Plans