Smart City Concept Plan for Coimbatore State Level Review I October - - PowerPoint PPT Presentation

smart city concept plan for coimbatore
SMART_READER_LITE
LIVE PREVIEW

Smart City Concept Plan for Coimbatore State Level Review I October - - PowerPoint PPT Presentation

Government of India Smart Cities Mission Ministry of Urban Development Smart Cities Challenge Stage 2 Smart Cities Challenge Smart City Concept Plan for Coimbatore State Level Review I October 2015 Coimbatore Municipal Corporation


slide-1
SLIDE 1

Government of India

Ministry of Urban Development

Smart Cities Mission

Smart Cities Challenge – Stage 2

Smart Cities Challenge

Smart City Concept Plan for Coimbatore

State Level Review I

October 2015 Coimbatore Municipal Corporation Government of Tamil Nadu

slide-2
SLIDE 2

Presentation objective

 TUFIDCO and Coimbatore Municipal Corporation retained IMaCS to

assist Coimbatore Municipal Corporation for participation in Smart Cities Challenge

 Objective of today’s presentation is to share

  • Assessment of City Baseline
  • Round I Consultations – status and findings
  • Initial views on Vision, Priority Goals and Strategies
  • Next steps
slide-3
SLIDE 3

Approach

Baseline assessment

  • Earlier studies
  • Ongoing / proposed initiatives / plans
  • Service levels / assessment indicators

Formulate City Vision, Goals & Strategies

  • Review Vision and Goals under earlier initiatives
  • Validate Vision themes and Priority Goals from Consultations

Crystallise Vision Statement, Values, Goals and Strategies

Consultations - Round I

  • Face-to-Face, Social Media/My Gov
  • Dissemination on Media / Website
  • MOUD guidelines
slide-4
SLIDE 4

Areas for self-assessment suggested by GoI

1 City Identity and culture 13 Water management 2 Economy and Employment 14 Waste-water Management 3 Mixed Use 15 Waste management 4 Compactness 16 Sanitation 5 Walkable 17 Air Quality 6 Transport 18 Housing and Inclusiveness 7 Open Spaces 19 Education 8 Energy Supply 20 Health 9 Energy Source 21 Safety and Security 10 Energy Efficiency 22 Citizen particpiation 11 Underground wiring 23 IT connectivity 12 Water Supply 24 Intelligent Govt. Services

Grouped under 4 themes for baseline assessment and eliciting suggestions / formulating Vision, Priority Goals and Strategies

slide-5
SLIDE 5

Framework for Smart City Concept Plan

Structure, Economy, Mobility

  • City Identity and culture
  • Economy and Employment
  • Mixed Use
  • Compactness
  • Walkability
  • Transport
  • Open Spaces

Watsan, Energy and Environment

  • Water Supply / Management
  • Waste-water Management
  • Waste management
  • Sanitation
  • Energy Supply / Source / Efficiency
  • Underground wiring
  • Air Quality

Smart Solutions and IT-led delivery

  • Citizen participation
  • IT connectivity
  • Intelligent Govt. Services

Inclusion, Housing and Security

  • Housing and Inclusiveness
  • Education
  • Health
  • Safety and Security

Vision, Priority Goals and Strategy Baseline Assessment, Consultations

slide-6
SLIDE 6

Agenda

 City Baseline  Round I Consultations  Vision, Priority Goals and Strategy  Next steps

slide-7
SLIDE 7

City Structure and demographics

 Coimbatore Corporation expanded in 2011

  • Area – 257.04 sq.km
  • 5 Zones, 100 Wards

 Population and density

  • At Census 2011 – 16.02 lakh
  • Decadal Growth 73.78%*, within Core area ~ 15.45%
  • Density 63 ppha; within Core area ~ 104 ppha
  • 2015 Population ~ 17.28 lakh; 27.84 lakh by 2045

 Regional connectivity and growth pattern

  • Dense areas: Core city, Kaundampalayam and Kuruchi
  • Growth along radials in North, South and East
  • 3 NHs- NH-47, NH-67 and NH 209 traverse city
  • International airport and railway junction

*Corporation area expanded by merging neighboring areas

slide-8
SLIDE 8

City Economy

 Economy of Coimbatore District

  • 4th largest economy among TN districts; 6th in per capita terms
  • Large secondary sector contributing over 40% to the Economy
  • Key industries include Textiles, Foundry and manufacturing
  • Largely Services based; Tertiary sector provides major employment to the

population

  • Second largest software service provider in Tamil Nadu
  • Serves as a major education and textile hub
  • Houses country’s largest amount of hosiery and poultry industries
  • Health industry alone stands at Rs. 1500 crore as on 2010
  • Two SEZs- Hi-tech infrastructure and TIDEL Park (five more proposed)
slide-9
SLIDE 9

Mobility..1

Road Network ~ 2224 km of which 112 km are arterial roads

Road length per sq. km ~ 8.65

Surfaced roads >70%

Several Railway Level crossings in the city

NH - 67 NH - 209 NH - 67 Airport Coimbatore Junction NH - 47 NH - 47

N

slide-10
SLIDE 10

Mobility..2

 Modal share of trips

  • Bus - 42%

Two Wheeler - 21% Walk -14% Car -17% Cycle – 1% Autorickshaw – 5%

  • Average motorised trip length ~ 10 km

 Bus Transport operated by TNSTC / private operators

  • Over 940 city buses (TNSTC- 640 , private- 300)
  • Number of mofussil routes is 119 with 500 buses

 CMP proposals

  • 53 roads under road development plan including Ring road and Bypass road
  • Junction improvements include 7 signalization and 7 flyovers
  • 9 Road over bridges and Road under bridges
  • 9 Foot over bridges/ subways
  • Relocation of Gandhipuram Bus Stand, Mofussil Bus Stand, Town Bus Stand and Thiruvalluvar Bus

Stand at Vellalore

  • Parking facility proposals include 2 off- street On- ground and 7 MLCPs
  • BRT/ LRT – 2 corridors , Metro- 2 corridors
  • NMT proposals include construction of 460 km of footpaths and cycle tracks
slide-11
SLIDE 11

Open spaces, green areas and parks

Particulars Quantity Open spaces/ parks (Nos. ) 69 Area of parks (sq.m) 93672 Particulars Status Norms OS availability sq.m/cap. 1.19 10-12 OS in built up area sq.m/cap. 0.59 2

 Prominent Green Spaces in city

  • Developed Parks include VOC Park,

Kovai Courtallam, TNAU Park, Race Course Children’s park

 Issues

  • Limited open spaces vis-à-vis norms
  • Pollution in canals

 Proposals

  • Green cover around Odais , canals and

water bodies

  • Cleaning of odais and 8 water bodies
  • Identified 74 locations to develop

children parks and green space

slide-12
SLIDE 12

Water Supply

Particulars Unit Current 2021 Demand Treatment MLD 275 309 Storage LL 475 877 Distribution km 1007 3069

 Existing scenario

  • Siruvani, Pillur, Aliyar and Bhavani
  • Extended areas not yet serviced
  • Less than 50 % of households have

access to piped water supply

Pollution of groundwater and surface sources a serious concern

City fares well on cost recovery and collection efficiency

DPR for 24x7 supply for core areas

Proposals for improving storage capacity and source augmentation sent for AMRUT funding Physical Infrastructure needs Existing Service Levels Vs. Norms

Indicators Existing Norm Coverage 44% 100% Per capita supply 39 LPCD 135 LPCD Metered connections % 26% 100% NRW % 56% 20% Quality 75% 100% Cost recovery 60% 100% Collection efficiency 60% 90%

slide-13
SLIDE 13

Domestic waste-water management

 Existing system

  • Covers only an area of 18 Sq.km (7% of total area) having sewer lines of 162 ( 5% of

total road length) km and 24380 (5% of house holds) service connections

 Underground Drainage System under construction

  • Area of 87 sq.km, Sewer Lines 582 km and 103506 connections

 DPR for uncovered areas prepared along with reuse of treated water.

  • Estd. Project cost = Rs. 1631 crore

 Feasibility / Transaction advisory for TTRO/Waste-water reuse initiated  Access to Toilets needs improvement

  • 7.5% of the households are without any outlet or toilets
  • Discharge of sewage to water bodies and storm water drains.
slide-14
SLIDE 14

Municipal Solid Waste

Waste Generation TPD 815 Generation per capita/day gms 504 Service benchmarks Service level Norm Existing Door to door coverage 100% 80% Efficiency of collection of MSW 100% 95% Segregation 100% 60% MSW recovery and disposal 100% 65%

500 MT collected transported to compost plant in Vellalore operated by a private agency

100 MT is transported to Vermi Compost plant and bio-gas plant

10 MT of solid waste is sent to bio-methanation plants for waste to energy conversion

Winner of SKOCH award for decentralised waste management recently

Key Initiatives/ Proposals

  • New 100 MT plant for C&D waste + New processing plant of capacity 500 MT in Vellalore
  • Proposal for 100% source segregation and decentralization of disposal of solid waste
  • Additional capacity creation for bio-methanation under consideration
slide-15
SLIDE 15

Water ways and drains

Storm Drain length (manmade) Km 1780 Natural Drains (7 Nos.) km 45

  • No. of locations of water logging

Nos. 78 Incidence of sewerage mixing % 25% of total HHs

 Dumping of sullage and waste-water in Storm drains

  • 25% of the households discharge waste water directly into the drains
  • Identified 8 location of chocking of drains because of solid waste

 Inadequate routine maintenance and cleaning and de-silting of drains  Key Initiatives/ Proposals

  • Proposal for construction of storm water drains in added areas
  • DPR for rejuvenation of water bodies
slide-16
SLIDE 16

Energy

 Need to improve distribution infrastructure  Key Initiatives/ proposals

  • Underground electric cable system through the city in pipeline
  • Solar energy generation meeting at least 10% of demand (50MW)
  • Energy efficient lighting could help achieve energy savings and savings in maintenance /

replacement Electricity Infrastructure

Particulars Unit Quantity Sustained Demand MW 500

  • No. of substation

Nos. 12 Demand met by renewable sources MW 10 Particulars Quantity Street Lights - nos. 69292 Spacing between streetlights 42 m

Street lights

slide-17
SLIDE 17

Urban Environment

 Issues

  • Water: water bodies contaminated because of discharge of untreated

domestic and industrial effluents

  • Air: Core City area experiences heavy traffic and air pollution. Particulate

Matter (PM) values higher than norm

  • Noise: Noise level in core city area high due to continuous traffic flow
  • Lack of green cover resulting in temperature increase in the city

 Key Initiatives/Proposals

  • Rejuvenation and preservation of 8 contiguous water bodies in City proposed
  • Creation of a Green area and open space on Old Jail land proposed
slide-18
SLIDE 18

Services to urban poor

Particulars Unit Quantity Indicators No of Slums No. 231 In the entire area Slum Households Nos. 36151 15 % of households Slum population in core area Nos. 180775 22 % of population

 Slums facing constraints in access to basic services

  • Densely populated and inadequate infrastructure
  • Most of the slums located in environment sensitive areas like low lying areas
  • Poor access to public convenience, Solid waste collection, storm drainage and street lights

 Slum redevelopment plans proposed as per the Slum free city action plan

  • A total cost of Rs. 2923 crore proposed for both preventive and curative measures
slide-19
SLIDE 19

Healthcare and education

 Healthcare

  • Preferred healthcare destination for people

from nearby districts

  • More number of doctors and nurses

required

 Education

  • On Quantitative parameters – Coimbatore

fares well

  • Need for modernization of schools

Education Centers Total 1 Professional colleges 192 2 Training Institutes 24 3 Higher Secondary Schools 321 4 High Schools 483 5 Primary schools 131 Health facilities Total 1 Hospitals 143 2 Dispensaries 140 3 PHCs 110 4 Health Sub Centres 328 5 Other Medical Institutions 221 6 Bed Strength 1717 7 No. of Doctors 537 8 No. of Nurses 491

slide-20
SLIDE 20

Markets and Bus Terminus

 Observations

  • About 21 markets which are many years old; they are in dilapidated condition
  • Six bus terminals -Town Bus Stand, Ukkadam Bus Stand, Singanallur Bus Stand,

Mettupalayma bus stand, Thiruvallur Bus stand and the Central Bus Stand at Gandhipuram

 Key Initiatives/ Proposal

  • Improvements to vegetable and fish markets proposed
  • Redevelopment of two markets at Metupalayam road and Sundarapuram proposed
  • Relocation / Re-development of Bus terminals and integrated new bus terminal at

Vellalore proposed

slide-21
SLIDE 21

City Structure, Economy, Mobility and Open spaces Watsan, Energy & Environment Housing, Inclusion & Security Citizen Engagement, Governance & IT-led service delivery

slide-22
SLIDE 22

E-governance and Citizen-led service delivery

 Electronic delivery of services

  • Online payment gateway for all revenues; property tax, profession tax, user

charges and non-taxes

  • Online Grievance redressal
  • Online provision of birth and death certificates
  • Online building plan submission
  • E-tendering
  • Upgrade to web-enabled application proposed

 Surveillance: CCTV surveillance at important locations

slide-23
SLIDE 23

Self-Assessment..1

Parameter Score Qualitative self-assessment Indicators Initiative(s) for improvement Identity and Culture 2  Historic / cultural resources preserved/utilised to some extent  Limited resources 

  • No. of Heritage assets

 Parks / water bodies  Special regulations for development if any Prepare micro plans for the city to renew and re-develop these areas; Building regulations for heritage Economy & Employment 4  Range of job opportunities  Attempts to integrate informal activities with formal parts of the city  Number of industry associations and players  Organised industry parks 

  • No. of SMEs

 Proposals for modern facilities Ease the environment for doing or starting business, Expediting plans for Effluent Treatment and modernisation/ shifting of market(s) Mixed Use 3  Most parts have housing, and

  • ffices in close proximity.

 Some neighborhoods have light industrial uses Land use rules allow for mixed uses.  Allowance for mixed-use in master plan  % of Commercial properties across wards / zones Shifting and re-development

  • f Market area and bus

terminals could help de- congest city downtown Compact 1  Very congested core city, but ‘Sprawling’ tendency seen in extended areas  Automobile dependence increasing  Share of Two wheelers in trips  Population density across city 

  • No. of active re-

development proposals Prepare transit-oriented micro plans for the city to (1) renew and re-develop older core areas and (2) avoiding sprawling unplanned growth in periphery

slide-24
SLIDE 24

Self-Assessment..2

Parameter Score Qualitative self-assessment Indicators Initiative(s) for improvement Public Open Spaces 2  Very few public open spaces are available in some neighborhoods,  Many open spaces are not well- maintained.  Public open spaces are lacking 

  • No. of parks and

well-maintained

  • pen spaces

  • No. Of recreational

spaces  Expedite the proposal to create green spaces by rejuvenating existing

  • dais and canals and

rejuvenate all existing park locations with public participation. Transport 2  High quality Public transport choices are restricted, although share of public transport is high.  Pedestrian infrastructure is only available in select areas.  City Mobility Plan identifying proposals for improving mobility completed.  Recent City Mobility Plan identifies proposals  Share of public transport Implement proposals identified under the CMP in a phased manner. Walkability 2  Older areas see a mix of pedestrians, cyclists, and vehicles  In the new areas, there are few pavements.  Inadequate compliance and enforcement of traffic rules  % of roads with foot paths  Implement proposals identified under the CMP in a phased manner.

slide-25
SLIDE 25

Self-Assessment..3

Parameter Score Qualitative self-assessment Indicators Initiative(s) for improvement Energy supply 3  Electricity is available in most parts of the city for most hours

  • f the day but some areas are

not so well-served. Smart metering exists in some parts of the city but not all. 

  • No. of Load

shedding events  Power consumption/ capita  Improve reliability by providing proposed sub-stations and universally implement smart metering. Energy source 3  Some energy through renewable

  • resources. City is preparing plans

for long-term strategic projects to tap renewable sources

  • Data on supply

from TANGEDCO  Initiate steps to implement solar roof- top project in all large government and institutional buildings. Water Supply 1  Poor water supply system with limited water availability  Intermittent water supply  UFW>40%.  Duration of supply  Reported UFW  Implement proposed 24x7 supply project for which DPR has been already prepared Water Managemen t 3  The city has meters for parts of its water supply  Rainwater harvesting systems are installed.  Recycling of waste water/ storm water is limited  % of metered connection  RWH in bye-laws and building regulation  Strengthen institutional mechanisms and adopt smart solutions to enforce metering and RWH implementation

slide-26
SLIDE 26

Self-Assessment..4

Parameter Score Qualitative self-assessment Indicators Initiative(s) for improvement Waste water management 1  The city is unable to treat all its

  • sewage. Many local sewer lines
  • pen on to water bodies and
  • pen ground

 % of waste water treated

  • Complete proposed

Sewerage and Effluent treatment proposals and strengthen enforcement Air quality 2  High air pollution in core areas due to traffic congestion  Existing Air quality parameters  Implement air quality monitoring systems Energy efficiency 3  Most new buildings install energy efficiency systems.  Local government conducts

  • utreach to adopt energy

efficiency strategies  % of LED Lights in city  Promote green buildings and install energy efficient street lights across the city Underground electric wiring 2  Plans for underground cabling prepared and awaiting approvals Sanitation 2  Sanitation facilities > 80% % households with sanitation access  Implement projects to create universal access and involve citizen participation Waste Management 3  Waste generated is usually collected and segregated. Recycling and disposal is done % of waste segregates, recycled

slide-27
SLIDE 27

Self-Assessment..5

Parameter Score Qualitative self-assessment Indicators Initiative(s) for improvement Healthcare 3  City provides adequate health facilities. Have emergency response ambulance services.  Beds vis-à-vis norms  Availability of emergency response  Upgradation of Government Hospitals as an immediate priority Education 3  City provides adequate primary and secondary education facilities within easily reachable distance for most residential areas Housing and inclusiveness 2  Housing available but is highly segregated across income levels. Population growth slightly exceeds creation of new housing. Poor live in informal settlements.  % of population living in slums  Expedite and Implement slum free action plan Safety and Security 3  The city has high levels of public safety and the elderly feel secure in most parts of the city during most time in the day 

  • No. of CCTV

surveillance points in the city  Widen surveillance to hitherto uncovered areas

slide-28
SLIDE 28

Self Assessment..6

Parameter Score Qualitative self-assessment Indicators Initiative(s) for improvement Citizen Participation 3  Citizen engagement at city and local area with most

  • stakeholders. Findings

compiled and incorporated  Online grievance redress facility  Consultations in recent planning /project initiatives  Strengthen ward committees and scale up grievance redressal with analytics and citizen engagement features to help decision making IT Connectivity 2  City has made plans to provide high speed internet connectivity through the existing framework  Engage with private service providers to expand coverage and create wifi hotspots in important areas

  • f the city

Intelligent Government Services 2  Most of the services are provided online and offline. Data transparency helps

  • monitoring. Systems and

processes to better coordinate between various Government agencies are being developed.  Presence of an active ULB website  Facility for Online payments and service centres  Grievance redressal  Expeditious completion of proposed web-enabled upgraded e-governance application and creation of the proposed citizen engagement platform  Conduct GIS survey for real time mapping of the assets

slide-29
SLIDE 29

Agenda

 City Baseline  Round I Consultations  Vision, Priority Goals and Strategy  Next steps

slide-30
SLIDE 30

Continuation of ongoing consultations

from Round I Smart Cities Challenge

 Shape Your City Initiative

  • Two day workshop organised by CMC in collaboration with ICA
slide-31
SLIDE 31

Activity Brief Date Status

  • a. Key Stakeholders

Face to face/ focus group 30th September – 7th October Completed

  • b. Social Media

Multiple avenues including CCMC Web, Facebook page, and My GOV page – Active Regular updation on social media

  • c. Contest

Essay Writing competition for College and School Students- 8th October 2015

Stakeholders Date Status Print/ Media - conference 18th September 2015 Completed Elected representatives (Mayor and Council) 5th October 2015 Completed Line Departments 30st September 2015 Completed Traders, Traders, Doctors, Teachers, Bar association, Chamber of Commerce and RWAs 30st September 2015 Completed Zone North 5th October 2015 Completed Zone Central 5th October 2015 Completed Zone East 5th October 2015 Completed Zone West 6th October 2015 Completed Zone South 12th October 2015 Scheduled Indian Chamber of Commerce , CII & Codissia 7th October 2015 Completed

Round 1 Consultations...1

Summary

slide-32
SLIDE 32

Round 1 Consultations...2

Inclusive and extensive process carried out

Elected Representatives & City Administration Face-to-Face/Coalition bldg.

 NGOs, Active City Society Clubs, Residential Welfare associations, Physically challenged  Industrial Players and traders  Doctors Association, Teachers/ professors, Chamber of Commerce, Traders  College students

Zone level Consultation

(All 4 zones covered)

Social Media / Outreach

Online- Coimbatore Corporation Website, Facebook, MyGov Contest for Students – College & Schools Through Face-to-Face meetings, Media and Online forums

~ Over 300 participants ~ Over 500 participants

Vision Goals Strategies

>2,000 participants

slide-33
SLIDE 33

Elected Representatives & City Administration

Round 1 Consultations...3

slide-34
SLIDE 34

Focused Group

 NGOs, Active City Society Clubs, Residential Welfare associations  Industrial Players and traders  College Students  Doctors Association, Teachers/ professors, Chamber of Commerce, Traders

Focused Group

 NGOs, Active City Society Clubs, Residential Welfare associations  Industrial Players and traders  Doctors Association, Teachers/ professors, Chamber of Commerce, Traders

Round 1 Consultations...4

slide-35
SLIDE 35

Round 1 Consultations...5

Zonal level Consultations

slide-36
SLIDE 36

Online Avenues

Coimbatore Corporation Website Facebook MyGov

Round 1 Consultations...6

slide-37
SLIDE 37

Round 1 Consultations...7

Paper clippings

slide-38
SLIDE 38

Round 1 Consultations...8

slide-39
SLIDE 39

Agenda

 City Baseline  Round I Consultations  Vision, Priority Goals and Strategy  Next steps

slide-40
SLIDE 40

Ideas from consultations..1

Face to Face Economy, Mobility, Open spaces

Planned Development in extended areas for IT Services/ new Industrial parks

ULB should prepare city’s Master Plans and prepare detailed micro plans; Need to re- evaluate setbacks, FSI etc comprehensively to enable Transit orientation

Regional Trunk Infrastructure and Airport expansion

Create bus terminals at periphery

Pothanur circular rail link/Ring Road

Mass Transit Systems – Rail / Bus

Subway instead of Foot over bridges

Urban Road Design guidelines

Parks and Walk ways; Development of eight water bodies in core area along with park connectors; Urban Forestry along Singanallur Tank, Ukkadam Big tank etc.

Shifting wholesale markets to periphery

Museums

Trunk Road missing links identified in CMP

CODISSIA – as an example of a Smart City

Shift Government offices / administration

NTC Mills Area – Re-Development

Ukkadam area – Theme park

Ducting / Utilities mapping

Standardised speed breaker design

slide-41
SLIDE 41

Ideas from consultations..2

Face to Face

Expeditious implementation of proposed 24x7 water supply

Water logging is a serious concern – Solutions suggested in past study to be implemented

East-West road connectivity/ water logging needs resolution urgently

Continued focus on rainwater harvesting

Building lining walls across all water bodies

De-silting Siruvani

Watsan, Energy & Environment

Dedicated Energy feeders for Industries / Industrial areas

Energy Efficient street lighting – city wide

Greater emphasis on Solar; all government/institutional buildings + building bye-laws making it mandatory

Integrated Underground cabling and utility ducting

slide-42
SLIDE 42

Ideas from consultations..3

Face to Face

Affordable housing for all

Libraries across all Zones

CCTV surveillance and Traffic Enforcement

Fire Stations and decentralised water station provision in narrower roads

More focus on creating Entertainment avenues; Sports facilities and stadiums

Dedicated track for Ambulances/School vans

Neighbourhood schools

Encroachments especially in Periphery to be tacked urgently

Public and Community Toilets

Government-run Helpline to address various issues

Strengthen Grievance redressal

WIFI hotspots in key locations

Deemed Approvals for better accountability

Paperless administration; automated building plan approvals

Housing, Inclusion & Security Governance & IT-led service delivery

slide-43
SLIDE 43

Vision under earlier initiatives

CDP VISION

Making Coimbatore “A world-class, vibrant, affordable, economically and ethnically diverse, progressive city where citizens feel safe, enjoy their neighborhoods and access their city government”

‘Shape Your City’ Workshops

 Coimbatore as the hub for the region’s Economic and Cultural life  Themes

  • Economy

Innovation Governance Ecology

  • Mobility

Culture Built-up Environment

slide-44
SLIDE 44

Vision Statement

Coimbatore will be an inclusive, secure, effectively governed and well-planned global metropolis that offers universal, affordable access to Best-in-Class Civic services and efficient Transit Orientation while fostering a Dynamic and Vibrant Economy, nurturing a Clean, Green, Resilient and Sustainable Environment and striving to provide the highest Quality of Living standards for a progressive, diverse and talented populace.

slide-45
SLIDE 45

Key Vision themes and Priority Goals

 Universal, affordable access to Best-in-Class Civic services  Efficient Transit Orientation  Clean, Green, Resilient and Sustainable Environment  Progressive, diverse and talented populace  Effectively governed and well-planned metropolis

slide-46
SLIDE 46

Priority Goals and Strategies..1 THEME 1 - Universal access to Best-in-Class Core Services

GOALS STRATEGY(IES) 100% access - 24x7 Metered Piped Water Supply

  • PPP for 24x7 water supply in Core Areas
  • Augmentation of Source / Treatment
  • Extension of 24x7 water supply

100% access to safe collection and disposal of Waste water

  • Completion of ongoing UGD system
  • Implementation of UGD for uncovered areas
  • Septage mgmt/decentralised treatment for uncovered areas
  • Evaluate feasibility / Implement Re-use projects

100% compliance to SWM Rules 2000

  • Extension Project Shunya - Decentralised SWM
  • Expansion of Waste processing capacity
  • Bio-methanation plans for local waste treatment
  • Facility for Processing of C&D Waste

Open Defecation free city

  • Expand provision of Public Toilets / Namma Toilets

Housing for all / Inclusion

  • Implement Slum-free City Action Plan proposals
  • Designated Hawking Zones
  • Enforcement to prevent encroachments
  • Expand/modernise Public Healthcare / Primary schools

24x7 Electricity and Broadband Access

  • Ducting, distribution improvements, underground cabling
  • Facilitate WiFi Hotspots and Fiber backbone
slide-47
SLIDE 47

Priority Goals and Strategies THEME 2 – Effective Transit orientation

GOALS STRATEGY(IES) Reduce Accidents and Fatalities to Zero

  • Act on actions identified on Accident Black Spots
  • Implement synchronised signalling and ITS systems
  • Strengthen enforcement; implement CCTV surveillance

Increase share of Public Transport

  • Improve Bus systems to increase share of Public Transport
  • Implement Mass Transit solutions on identified corridors
  • Re-design Bus shelters and spaces of high floating population

to enable seamless integration Improve NMT Facilities

  • Implement NMT measures identified in CMP

Reduce Traffic Congestion

  • Implement Ring Road development and new Roads
  • Bridges, Grade Separators, Junction Improvement
  • Implement

proposals for relocation/redevelopment

  • f

Markets, Bus terminals and Institutional areas Address other Regional and Trunk Infrastructure needs

  • Work with AAI to facilitate Airport Expansion / more flights
  • Regional High Speed Trunk Road/Rail connectivity
slide-48
SLIDE 48

Priority Goals and Strategies THEME 3 – Clean, Green, Resilient, Sustainable Environment

GOALS STRATEGY(IES) Increase Green Cover

  • Rejuvenate and improve eight lakes and green

areas around it

  • Rejuvenate Singanallur Tank
  • Implement proposed program to develop Parks
  • Road improvements and Avenue Trees

Arrest Water Pollution and improve Ground water table

  • Continued focus on RWH and thrust on Re-use
  • Stringent enforcement of Industrial Pollution

prevention measures

  • Complete UGD projects and implement septage

management policy of GoTN Increase share of Clean Energy

  • Continued thrust on Solar and Wind generation

Improve Air Quality

  • Ambient Air Quality monitoring
  • Initiate traffic improvement measures
  • Awareness programs to reduce idling in traffic

Implement Recommendations and Actions identified under Solar City Plan Identify and implement Actions to deal with Climate Change and build resilience

slide-49
SLIDE 49

Priority Goals and Strategies THEME 4 – Progressive, diverse and talented populace

GOALS STRATEGY(IES) Improve Soft Infrastructure

  • Facilitate creation of soft infrastructure facilities –

Multi-Sports stadium, Museum, and Theme Park Facilitate creation of world class Health care and Education facilites

  • Work with GoTN to implement Medicity as

envisaged under Vision TN 2023

  • Evaluate

feasibility to create a Greenfield Knowledge City Create Infrastructure and enabling environment to attract Investments in core and sunrise sectors

  • Work with GOTN to implement proposed nodes
  • n the Cbe-Salem Industrial corridor
  • Prepare Detailed Development Plans for

peripheral areas to facilitate investments in sunrise sectors including IT and Financial services

slide-50
SLIDE 50

Priority Goals and Strategies THEME 5 – Effectively governed, well-planned metropolis

GOALS STRATEGY(IES) Transparent Seamless Governance and Effective Citizen Engagement

  • Implement proposed Web-Enabled E-

governance application

  • Improve Information Disclosure standards and

enforce compliance

  • Strengthen Grievance Redressal and expand to

create an active Citizen Engagement Platform Inculcate a Planning Culture

  • Prepare updated Master Plan for expanded

CMC; prepare Detailed Micro Area level Plans in a time bound manner

  • Create capacity at ULB for preparing and

enforcing Master Plans and DDPs Enhance Capacity to Deliver

  • Undertake a Zero-base assessment of manpower

and technology needs Rationalise Taxes and Fees

  • Work with GOTN to rationalise taxes and fees

while removing distortions and improving coverage

slide-51
SLIDE 51

Agenda

 City Baseline  Round I Consultations  Vision, Priority Goals and Strategy  Next steps

slide-52
SLIDE 52

Pan-city initiatives – ideas under consideration

 Basic services with smart features

  • 24x7 Supply for Extended Areas (converged with ongoing PPP project)
  • Sewerage for extended areas
  • City wide Renewal of Water Bodies
  • Proposals identified under NMT under CMP
  • Municipal Solid Waste collection and segregation

 Other ‘smart’ initiatives

  • Web-enabled E-governance / Mobile apps based e-governance
  • City wide fibre networks and WiFI Hotspots
  • Underground electric cabling, ducting for utilities
  • Energy efficient street lighting
  • CCTV surveillance
  • Waste Processing / Waste- to Energy

Initial listing; to be finalised

Scalability: Can it be scaled up quickly – say within 5 years Bang for the buck: Multiplier Impact Vs. Level of Financing required Implementabilty: How easy it is to implement

slide-53
SLIDE 53

Area Development Plan

 Initial Views

  • Area Development Plan to be crystallised in Round II
  • Initial preference towards Retrofit / Re-development options
  • Retrofit of select Residential/Commercial Areas in City
  • Convergence with other initiatives
  • Replication possibility
  • Hybrid Redevelopment + Retrofit options need to be evaluated
  • Most stand-alone Re-development options available do not meet minimum size
  • Bus-Stand Terminal area re-development + adjoining residential/commercial areas
  • Water Bodies/ Green Area re-development + Retrofit of adjoining areas

 Criteria

  • Project Scale and Scope
  • High Replicability Vs. High Transformative Impact
  • Convergence potential
  • Practical Limitations / Stakeholder buy-in
  • Fit with MOUD guidelines
slide-54
SLIDE 54

Next steps

 Round I Consultations almost completed  Incorporation of Feedback from State level Review  Submission of Smart City Concept Plan - 12th October

slide-55
SLIDE 55

Thank You