Titre
Titre Drawbacks of standard fittings Dead Volume. Parts Inventory - - PowerPoint PPT Presentation
Titre Drawbacks of standard fittings Dead Volume. Parts Inventory - - PowerPoint PPT Presentation
Titre Drawbacks of standard fittings Dead Volume. Parts Inventory Gaskets Welding Panel Design Particle Generation Assembly Twisting of Tubes Footprint Male / Female FLOWMECA The RHP Fitting Patent
Drawbacks of standard fittings
- Dead Volume.
- Gaskets
- Particle Generation
- Twisting of Tubes
- Male / Female
Parts Inventory • Welding • Panel Design • Assembly • Footprint •
The RHP Fitting
FLOWMECA
™ Patent protected
Ensemble
Flange Centering ring Protection ring Gland Flange
Gland
Gland Surface finish Sealing surface Interior surface
Ra 0.4 (10 Ra) Ra 0.2 (5 Ra)
Protection Ring PTFE It's not a gasket
Leak Port Gland Centering Ring
Centering Ring
Leak Port
Flanges
Screws Silver coated
Metal to metal contact Axial tightening
Standard versus RHP
Lighter
134 g 42 g
Smaller
80 mm 37 mm 28 mm 50 mm 12 mm 24 mm
Cleaner
No Gasket No Dead Volume
Clean Contact
No Twist on the tubes
Reduced parts inventory
Standard RHP
10 part numbers 3 part numbers
Reduced parts inventory
Standard RHP No Male Female end fittings
Reduced footprint
Standard RHP
70.6 mm 50.8 mm
Easy of assembly
- Ease of
maintenance
Standard RHP
Allen 2.5 mm
Vacuum leak measurement
<1.10-10 atm.cm /s
3
No leak detected on any sample Vacuum and 200 bar pressure test at 300°C
With protection rings
RHP 1/4” Vacuum tests
Leak: <1.10-10 atm.cm /s
3 Without protection rings
- 100°C
+20°C +180°C
- 100°C
+20°C +550°C
20 bar
Leak: <1.10-10 atm.cm /s
3 +180°C
Helium pressure tests
80 bar +180°C 650 bar +20°C
RHP 1/4”
No detected leak
1,900 bar
Oil high pressure tests
RHP 3/8” 1,600 bar 1,600 bar (burst pipe)
At 1,600 bar pipe bursts
Comparative test
A = VCR B = S-VCR C = Parker D = RHP
Comparative test
250 assembly cycles
Leak rate:
<1.10-10 atm.cm /s
3
Radioactive Isotope Test
D (H ) & T (H )
Tritium accumulation in a glove box at 16 bars
No leak after 16 days
2 3
Drawbacks of standard fittings
- Dead Volume
- Gaskets
- Particle Generation
- Twisting of Tubes
- Male / Female
Parts Inventory • Welding • Panel Design • Assembly • Footprint •
? ?
Applications:
UHP Gas Systems UH Vacuum High/Low Temperature High Pressure Semi Solids Liquids
Product:
Butt Weld: 1/8” to 4” Tees, Crosses, Ells etc. “Click Pipe”: 1/8” to 1” “And more to come!
RHP winner by technical KO
Weld
Problems related to welding
- Number of Welds
- Deterioration of Tubing
- Bulky Equipment
- Clean Area Contamination
- Moisture Retention
Testing • Safety • Contamination• Personnel Costs • Maintain Tolerance •
? ?
Weld Weld Weld
Patented
Basic Idea
A tube
Click Groove Sealing surface
Ra 0.4 (10 Ra)
Click pipe
A Click Pipe
Titre
Click Pipe Full
Two tubes
Drawbacks of standard fitting
- Dead Volume
- Gaskets
- Particle Generation
- Twisting of Tubes
- Male / Female
Parts Inventory • Welding • Panel Design • Assembly • Footprint •
? ?
Drawbacks of standard fitting
- Dead Volume
- Gaskets
- Particle Generation
- Twisting of Tubes
- Male / Female
Parts Inventory • Welding • Panel Design • Assembly • Footprint •
? ?
Patented
With some Modular RHP components
With only 9 Modular RHP sub-components
Cross Elbow Tee Straight Flange Click-Pipe
RHP Modular Grid 1” x 1”
elbows and tees, components, RHP Modular Grid 1” x 1”
tubes and click-pipes, elbows and tees, Components, RHP Modular Grid 1” x 1”
flanges. tubes and click-pipes, elbows and tees, Components, RHP Modular Grid 1” x 1”
Modular gas panel
Reduced footprint
- 30%
to
- 50%
Reduced design time
- 75%
Easy to assemble
- Easy
to maintain
Main References
- Air Liquide
- Leybold
- Unaxis Balzers
- IBM
- Argonne Nat Lab
- L'Oréal
Motorola • Trikon • Siemens • ST Microelectronics • Rhône Poulenc • Matra Marconi Space •
Why IGS Systems ?
- Reduced connections.
- Fewer welds.
- Reduced Footprint.
- Lower Cost.
- Process improvement
- Less dead volume.
- ??????
Integrated Gas System
- High cost
- More Connections
- Welding still required
- Many different sealing
systems
- Completely new parts
inventory
The Facts
- 8 Component IGS Stick has 18
gasketed connections 36 seal planes.
- Welds are still required.
- Reduced Footprint. Yes BUT $$$
- Cost may be 3-4 X present.
- Blocks & Gaskets = dead volume
- Process improvement. ???
RHP Modular
—> Initial —> Replacement —> No Gasket —> No dead volume —> Fewer Connections
- Low cost
- Easily modified
- Same parts inventory
- Connections
- Weld free
The Facts
- RHP Has 8 gasket free connections.
- No welds required.
- Reduced Footprint. Yes.
- Cost same as present.
- No Blocks No Gaskets No dead volume
- = Process improvement.
FLOWMECA
The RHP Fitting
™ Patent protected