Titre Drawbacks of standard fittings Dead Volume. Parts Inventory - - PowerPoint PPT Presentation

titre drawbacks of standard fittings
SMART_READER_LITE
LIVE PREVIEW

Titre Drawbacks of standard fittings Dead Volume. Parts Inventory - - PowerPoint PPT Presentation

Titre Drawbacks of standard fittings Dead Volume. Parts Inventory Gaskets Welding Panel Design Particle Generation Assembly Twisting of Tubes Footprint Male / Female FLOWMECA The RHP Fitting Patent


slide-1
SLIDE 1

Titre

slide-2
SLIDE 2

Drawbacks of standard fittings

  • Dead Volume.
  • Gaskets
  • Particle Generation
  • Twisting of Tubes
  • Male / Female

Parts Inventory • Welding • Panel Design • Assembly • Footprint •

slide-3
SLIDE 3

The RHP Fitting

FLOWMECA

™ Patent protected

slide-4
SLIDE 4

Ensemble

Flange Centering ring Protection ring Gland Flange

slide-5
SLIDE 5

Gland

slide-6
SLIDE 6

Gland Surface finish Sealing surface Interior surface

Ra 0.4 (10 Ra) Ra 0.2 (5 Ra)

slide-7
SLIDE 7

Protection Ring PTFE It's not a gasket

Leak Port Gland Centering Ring

slide-8
SLIDE 8

Centering Ring

Leak Port

slide-9
SLIDE 9

Flanges

Screws Silver coated

slide-10
SLIDE 10

Metal to metal contact Axial tightening

slide-11
SLIDE 11

Standard versus RHP

slide-12
SLIDE 12

Lighter

134 g 42 g

slide-13
SLIDE 13

Smaller

80 mm 37 mm 28 mm 50 mm 12 mm 24 mm

slide-14
SLIDE 14

Cleaner

No Gasket No Dead Volume

slide-15
SLIDE 15

Clean Contact

slide-16
SLIDE 16

No Twist on the tubes

slide-17
SLIDE 17

Reduced parts inventory

Standard RHP

10 part numbers 3 part numbers

slide-18
SLIDE 18

Reduced parts inventory

Standard RHP No Male Female end fittings

slide-19
SLIDE 19

Reduced footprint

Standard RHP

70.6 mm 50.8 mm

slide-20
SLIDE 20

Easy of assembly

  • Ease of

maintenance

Standard RHP

Allen 2.5 mm

slide-21
SLIDE 21

Vacuum leak measurement

<1.10-10 atm.cm /s

3

slide-22
SLIDE 22

No leak detected on any sample Vacuum and 200 bar pressure test at 300°C

slide-23
SLIDE 23

With protection rings

RHP 1/4” Vacuum tests

Leak: <1.10-10 atm.cm /s

3 Without protection rings

  • 100°C

+20°C +180°C

  • 100°C

+20°C +550°C

slide-24
SLIDE 24

20 bar

Leak: <1.10-10 atm.cm /s

3 +180°C

Helium pressure tests

80 bar +180°C 650 bar +20°C

slide-25
SLIDE 25

RHP 1/4”

No detected leak

1,900 bar

Oil high pressure tests

RHP 3/8” 1,600 bar 1,600 bar (burst pipe)

slide-26
SLIDE 26

At 1,600 bar pipe bursts

slide-27
SLIDE 27

Comparative test

A = VCR B = S-VCR C = Parker D = RHP

slide-28
SLIDE 28

Comparative test

slide-29
SLIDE 29

250 assembly cycles

Leak rate:

<1.10-10 atm.cm /s

3

slide-30
SLIDE 30

Radioactive Isotope Test

D (H ) & T (H )

Tritium accumulation in a glove box at 16 bars

No leak after 16 days

2 3

slide-31
SLIDE 31

Drawbacks of standard fittings

  • Dead Volume
  • Gaskets
  • Particle Generation
  • Twisting of Tubes
  • Male / Female

Parts Inventory • Welding • Panel Design • Assembly • Footprint •

? ?

slide-32
SLIDE 32

Applications:

UHP Gas Systems UH Vacuum High/Low Temperature High Pressure Semi Solids Liquids

slide-33
SLIDE 33

Product:

Butt Weld: 1/8” to 4” Tees, Crosses, Ells etc. “Click Pipe”: 1/8” to 1” “And more to come!

slide-34
SLIDE 34

RHP winner by technical KO

slide-35
SLIDE 35

Weld

slide-36
SLIDE 36

Problems related to welding

  • Number of Welds
  • Deterioration of Tubing
  • Bulky Equipment
  • Clean Area Contamination
  • Moisture Retention

Testing • Safety • Contamination• Personnel Costs • Maintain Tolerance •

? ?

slide-37
SLIDE 37

Weld Weld Weld

slide-38
SLIDE 38

Patented

slide-39
SLIDE 39

Basic Idea

slide-40
SLIDE 40

A tube

Click Groove Sealing surface

Ra 0.4 (10 Ra)

slide-41
SLIDE 41

Click pipe

slide-42
SLIDE 42

A Click Pipe

slide-43
SLIDE 43

Titre

slide-44
SLIDE 44

Click Pipe Full

slide-45
SLIDE 45

Two tubes

slide-46
SLIDE 46

Drawbacks of standard fitting

  • Dead Volume
  • Gaskets
  • Particle Generation
  • Twisting of Tubes
  • Male / Female

Parts Inventory • Welding • Panel Design • Assembly • Footprint •

? ?

slide-47
SLIDE 47

Drawbacks of standard fitting

  • Dead Volume
  • Gaskets
  • Particle Generation
  • Twisting of Tubes
  • Male / Female

Parts Inventory • Welding • Panel Design • Assembly • Footprint •

? ?

slide-48
SLIDE 48

Patented

slide-49
SLIDE 49

With some Modular RHP components

slide-50
SLIDE 50

With only 9 Modular RHP sub-components

Cross Elbow Tee Straight Flange Click-Pipe

slide-51
SLIDE 51

RHP Modular Grid 1” x 1”

slide-52
SLIDE 52

elbows and tees, components, RHP Modular Grid 1” x 1”

slide-53
SLIDE 53

tubes and click-pipes, elbows and tees, Components, RHP Modular Grid 1” x 1”

slide-54
SLIDE 54

flanges. tubes and click-pipes, elbows and tees, Components, RHP Modular Grid 1” x 1”

slide-55
SLIDE 55

Modular gas panel

slide-56
SLIDE 56

Reduced footprint

  • 30%

to

  • 50%
slide-57
SLIDE 57

Reduced design time

  • 75%
slide-58
SLIDE 58

Easy to assemble

  • Easy

to maintain

slide-59
SLIDE 59

Main References

  • Air Liquide
  • Leybold
  • Unaxis Balzers
  • IBM
  • Argonne Nat Lab
  • L'Oréal

Motorola • Trikon • Siemens • ST Microelectronics • Rhône Poulenc • Matra Marconi Space •

slide-60
SLIDE 60

Why IGS Systems ?

  • Reduced connections.
  • Fewer welds.
  • Reduced Footprint.
  • Lower Cost.
  • Process improvement
  • Less dead volume.
  • ??????
slide-61
SLIDE 61

Integrated Gas System

  • High cost
  • More Connections
  • Welding still required
  • Many different sealing

systems

  • Completely new parts

inventory

slide-62
SLIDE 62

The Facts

  • 8 Component IGS Stick has 18

gasketed connections 36 seal planes.

  • Welds are still required.
  • Reduced Footprint. Yes BUT $$$
  • Cost may be 3-4 X present.
  • Blocks & Gaskets = dead volume
  • Process improvement. ???
slide-63
SLIDE 63

RHP Modular

—> Initial —> Replacement —> No Gasket —> No dead volume —> Fewer Connections

  • Low cost
  • Easily modified
  • Same parts inventory
  • Connections
  • Weld free
slide-64
SLIDE 64

The Facts

  • RHP Has 8 gasket free connections.
  • No welds required.
  • Reduced Footprint. Yes.
  • Cost same as present.
  • No Blocks No Gaskets No dead volume
  • = Process improvement.
slide-65
SLIDE 65

FLOWMECA

The RHP Fitting

™ Patent protected