SITE PLAN AN REVIEW C COMMITTEE M MEETING # G #3 ROSSLYN HO HOLIDAY I INN NN (SP # #79 A 79 AMENDMENT) TRANSPORTATION & PARKING
Tuesday, June 17, 2019
1900 1900 N
- N. Fort
SPRC RC # #3 Tuesday, June 17, 2019 TRANSPORTATION & PARKING - - PowerPoint PPT Presentation
SITE PLAN AN REVIEW C COMMITTEE M MEETING # G #3 ROSSLYN HO HOLIDAY I INN NN 1900 1900 N N. Fort t Myer Dr Drive ( (SP # #79) 79) (SP # #79 A 79 AMENDMENT) SPRC RC # #3 Tuesday, June 17, 2019 TRANSPORTATION & PARKING Si
Tuesday, June 17, 2019
2
LEE HIGHWAY (WB) 19TH STREET
SITE
3
4
LAND USE EXISTING CONDITIONS PROPOSED CONDITIONS HOTEL 307 Rooms 344 Rooms RESIDENTIAL 0 DU 500 DU RESTAURANT 4,500 SF 10,850 SF RETAIL 0 SF 3,145 SF CONFERENCE SPACE 15,000 SF 35,870 SF PARKING PROVIDED 400 Spaces 818 Spaces
5
SITE
VEHICULAR ACCESS POINT LOADING ACCESS
6
Residential Tower Hotel Tower Hotel Access Residential Access Loading Access
Plan Provided by: MTFA
7
8
Plan Provided by: MTFA
9
Plan Provided by: MTFA
10
Plan Provided by: MTFA
11
Plan Provided by: Walter Phillips
EXITING ENTERING
12
EXISTING PROPOSED
Plan Provided by: Walter Phillips
13
EXISTING PROPOSED
Plan Provided by: Walter Phillips
14
EXISTING PROPOSED
Plan Provided by: Walter Phillips
15
Plan Provided by: Walter Phillips
16
17
18
19
LEE HIGHWAY (WB) 19TH STREET
SITE
20
1 2 3 4 5 6 8 9 7
21
LAND USE AM PEAK HOUR PM PEAK HOUR IN OUT TOTAL IN OUT TOTAL Hotel/Conference 38 32 70 27 51 78
Existing C g Conditions
LAND USE AM PEAK HOUR PM PEAK HOUR IN OUT TOTAL IN OUT TOTAL Residential 41 67 108 66 47 113 Hotel/Conference 56 63 119 69 67 136 Retail 18 15 33 35 33 68 Total 115 145 260 170 147 317 Net New Trips 77 113 190 143 96 239
Proposed ed C Conditions
*Accounts for non-auto mode share (i.e. bike, walk, transit, etc.)
22
Residential Tower Hotel Tower
AM/PM
29/46 12/20 47/33 20/14 37/52 37/52 78/100
Plan Provided by: MTFA
LEE HIGHWAY (WB) 19TH STREET
SITE
23 LEE HIGHWAY (EB)
Future Without: X/X
Condition AM/PM
C / C C / C B / C B / D D / C D / C E / C F / C B / B B / B C / C C / C B / C C / C Future With: X / X Future Without: X / X
+5.8 sec +0.8 sec +4.1 sec
24
25
EXISTING: 11 SPACES PROPOSED: 12 SPACES
3 5 3 6 2 3 1
26
OUTPATIENT PAVILION LAND USE SIZE CO ROSSLYN ZONING ORDINANCE PROPOSED PERCENT REDUCTION RATIO SPACES RATIO SPACES
Residential 500 DU 1 space per DU 500 spaces 0.698 spaces per DU 349 spaces
Hotel 344 Rooms 0.7 spaces per room 241 spaces 0.5 spaces per room 172 spaces
Retail 3,145 SF 1 space per 530 SF 6 spaces 1 space per 530 SF 6 spaces 0% Restaurant 390 Seats 1 per 6 seats over 200 seats 32 spaces 1 per 6 seats over 200 seats 32 spaces 0% Subtotal 780 spaces 559 spaces
LAND USE PROPOSED PARKING SUPPLY PROPOSED CLASS 1 BIKE PARKING SUPPLY PROPOSED CLASS 3 BIKE PARKING SUPPLY
Residential 349 spaces 200 spaces 10 spaces Commercial 469 spaces 36 spaces 9 spaces Total 818 spaces 236 spaces 19 spaces Conference/ Assembly 1,875 Attendees 1 per 3 seats 625 spaces 259 spaces
Grand Total 1,405 spaces 818 spaces
27
28
200 300 400 500 600 700 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM
Parking Spaces Required
Condition 1 Weekday Morning Event Shared Parking Analysis
Hotel Restaurant Conference Center
569 spaces required at 11 AM (Deficit = -100 spaces) Supply: 469 spaces
29
200 300 400 500 600 700 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM
Parking Spaces Required
Condition 2 Weekday Midday Event Shared Parking Analysis
Hotel Restaurant Conference Center
486 spaces required at 5 PM (Deficit = -17 spaces) Supply: 469 spaces
30
200 300 400 500 600 700 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM
Parking Spaces Required
Condition 3 Weekday Evening Event Shared Parking Analysis
Hotel Restaurant Conference Center
655 spaces required at 8 PM (Difference = -186 spaces) Supply: 469 spaces
31
200 300 400 500 600 700 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 AM
Parking Spaces Required
Condition 4 Weekend Evening Event Shared Parking Analysis
Hotel Restaurant Conference Center
495 spaces required at 9 PM (Deficit = -26 spaces) Supply: 469 spaces
32
CONDITION PARKING REQUIRED PARKING PROVIDED DIFFERENCE (SURPLUS/DEFICIT) CONDITION 1
(Weekday AM Event)
569 spaces 469 spaces
CONDITION 2
(Weekday Midday Event)
486 spaces 469 spaces
CONDITION 3
(Weekday Evening Event)
655 spaces 469 spaces
CONDITION 4
(Weekend Evening Event)
495 spaces 469 spaces
Shared ed P Parki rking A Analysis S Summary ry
33
Potential Elements of the TDM Plan Include.
tion a and F Funding
Faciliti ties a and Funding
Car arpool a l and V Van anpool P l Par arkin king
driveway counts, mode-slip surveys, and/or parking occupancy counts.
34