SLIDE 10 1
t End stages
Creation Stage PSTO Product Strategy Turn Over CRM Concept Review Meeting 2 CFR Cost Feasibility Review 3 FCR Final Concept Review 4 PDR Product Design Review 5 ELR Electronic Logic Flow Chart 6 TCP Tool / Capacity Plan 7 8 Manufacturing Technology
lopment Back End stages
20
Tooling Stage
1st S First Shot 21 TMR Tooling Model Review 22 WSP Working Sample Pilot 23
Debug Stage Materials Management stage
EP 1 Engineering Pilot 1 a ERP ERP system b SOE Sales Order Entry c MPS Master Production Scheduling d MRP Materials Requirement Planning e POR Purchase Order Release f CC Customs Contract g GR Goods Receiving h WPS Weekly Production Schedule i MPL Material Pick List 24 EP 2 Engineering Pilot 2 25 CPQ Component/Part Qualification 26 FTE Field Test Evaluation 27 FEP Final Engineering Pilot 28 Assembly Process Plan
Product Design and Development Process- front and back end stages
Detail Product Design and Development Process Front end and backend stages
22 Nov 2017
10th Global Supply Chain and Logistics Summit www.sclgsummit.org
9 Feb 2011
Product Design Front E
Development Stage 8 MTC Manufacturing Technology Consideration 9 SCC Supply Chain Considerations 10 MBD Made / Buy Decision 11 CQP Cost Quote Package 12 FDR Final Design 13 ESR Engineering Spec Release 14 Engineering Stage QP Quality Plan 15 PCP Process Control Plan 16 BOM Bill of Materials 17 PDC Packaging Design Confirmation 18 CDF Component Drawing Finalization 19 TSC Tool Start Confirmation
Product design and Develop
28 APP
Assembly Process Plan
29 WI
Work Instruction
30 JGA
Jig & Fixtures Approval
31 ERV
Engineering Review & Validation
32
Qualification Stage
PPA Packaging Printing Approval 33 PQT Product Qualification Test 34 TQP Tool Qualification Protocol 35 MPQ Molding Parameter Protocol 36 FPR Final Product Review 37 ERC External Regulatory Certifications 38 RTP Release to Production 39
Operations Stage
PP Pre-Production 40 PS Production Start-up 41 PST Product Stress Test 42 SR Shipment Release 43 FS First Ship 44 A Availability 45
Post Launch Stage
PLR Post launch Review 46 PLM Product Lifecycle management 47 PDS Product Disposal strategy