TEKFEN ENGINEERING TEKFEN HOLDING TEKFEN CONTRACTING TEKFEN - - PowerPoint PPT Presentation

tekfen engineering tekfen holding
SMART_READER_LITE
LIVE PREVIEW

TEKFEN ENGINEERING TEKFEN HOLDING TEKFEN CONTRACTING TEKFEN - - PowerPoint PPT Presentation

TEKFEN ENGINEERING TEKFEN HOLDING TEKFEN CONTRACTING TEKFEN AGRICULTURE TOROS AGRICULTURE TEKFEN HOLDING TEKFEN REAL ESTATE AND DEVELOPMENT TEKFEN VENTURES TEKFEN INSURANCE CONTRACTING GROUP CONTRACTING GROUP TEKFEN CONSTRUCTION - FACTS


slide-1
SLIDE 1

TEKFEN ENGINEERING

slide-2
SLIDE 2

TEKFEN CONTRACTING TEKFEN INSURANCE TOROS AGRICULTURE TEKFEN AGRICULTURE TEKFEN REAL ESTATE AND DEVELOPMENT TEKFEN VENTURES TEKFEN HOLDING

TEKFEN HOLDING

slide-3
SLIDE 3

CONTRACTING GROUP

CONTRACTING GROUP

slide-4
SLIDE 4

TEKFEN CONSTRUCTION - FACTS & FIGURES

Completed Projects from 7 Different Countries Employees From Different Countries

slide-5
SLIDE 5

International Offices

CONTRACTING GROUP INTERNATIONAL OFFICES

Azerbaijan Morocco Kazakhstan Russia Germany Qatar Saudi Arabia Iraq

slide-6
SLIDE 6

Bayıl Yard

Baku Caspian Sea

Ceyhan Plant

Mersin Adana Antakya Mediterranean

Derince Plant

Istanbul Izmit Black Sea Marmara Eagean Sea

WORLDWIDE MANUFACTURING & FABRICATION CAPABILITIES

slide-7
SLIDE 7

TEKFEN MANUFACTURING - Derince Heavy Steel Manufacturing Plant

CAPABILITY Spherical Tank Production : 20.000 ton/yr Pressure Vessel : 5.000 tons/yr Heat Exchanger : 5.000 tons/yr Storage Tanks : 30.000 tons/yr FACILITY Fabrication Facilities : 19.000 m² Total Plant Area : 48.000 m²

The most experienced company on process and storage equipment in Turkey.

slide-8
SLIDE 8

TEKFEN CONSTRUCTION- Ceyhan Steel Structure & Spool Fabrication Plant

FACILITY Fabrication Facilities: 30.000 m² Total Plant Area : 160.000 m² CAPABILITY Pipe Spool:400.000 WDinch/yr Steel Works : 30.000 tons/yr

slide-9
SLIDE 9

TEKFEN CONSTRUCTION- Azerbaijan Bayıl Fabrication Facility

FACILTY Fabrication Facilities : 30.000 m² Total Plant Area : 400.000 m² CAPABILITY Pipe Spool : 400.000 WDinch/yr Steel Works : 20.000 tons/yr Fabrication Erection and Assembly of Offshore Topsides

slide-10
SLIDE 10

FACTS & FIGURES - HALLESCHE MITTELDEUTSCHE BAU AG (HMB)

Halle

Arranged European ECA financing to TEKFEN / non-TEKFEN projects in Turkey, Europe, CIS Region

250+ Million USD

HMB was established in 1959 and acquired by Tekfen Construction in 1993. Immediately after that acquisition HMB, alone or in JV with

  • ther contractors, had undertaken various prestigious

projects such as:

  • Leuna 2000 Refinery,
  • Spreebogen Tunnel,
  • German Chancellery (Bundeskanzleramt),
  • Plenty of bridges, overpasses and viaducts for DEGES,
  • Shopping Malls,
  • Apartment blocks for private investors in Germany.
slide-11
SLIDE 11

TEKFEN ENGINEERING

slide-12
SLIDE 12

TEKFEN ENGINEERING

INTRODUCTION HISTORICAL MILESTONES TEKFEN ENGINEERING FACTS & FIGURES BATTLEFIELD TEKFEN ENGINEERING SERVICES SOFTWARE COMPETITIVE ADVANTAGES MAJOR PROJECT PARTNERS MAJOR CLIENTS

slide-13
SLIDE 13

INTRODUCTION

Tekfen Engineering was founded in 1984 to complete the EPC triangle for turnkey projects within Tekfen Contracting Group. We aim to meet each client’s schedule, budget, performance and quality goals by applying our wealth of design expertise and practical experience, and our management skills. Our multidisciplinary base enables us to cover all project components and stages from concept to completion, providing a totally integrated and quality assured one-stop service.

slide-14
SLIDE 14

1984

Tekfen Engineering was founded in 1984.

1989

First Highway Project was executed for KGM in 1989.

2003

First Subway Design was enforced for M1 Taksim Subway Project.

HISTORICAL MILESTONES OF TEKFEN ENGINEERING

First 3D Design was implemented in 2003.

1993 2011

Longest Slurry Pipeline was accomplished for OCP Project in 2011.

2012

First EPC Project was executed for Toros Tarım.

slide-15
SLIDE 15

2013

Baku Branch Office was opened in Azerbaijan.

2013

BIM Award was achieved for Baku Olympic Stadium.

2013

First Consultancy was executed for General Directorate of Highways.

HISTORICAL MILESTONES OF TEKFEN ENGINEERING

Tekfen Engineering was awarded its First Major Revamp Project in İzmir Tüpraş Refinery.

2013 2016

First Renewable Project Owner’s Engineering was accomplished for TURCAS.

2016

Tekfen Engineering was awarded its First FCC Revamp Project in Tupraş İzmit Refinery.

2018

First EPCM project was executed for SOCAR (HAOR) LPG Loading Station Project.

slide-16
SLIDE 16

50 65 75 85 98 120 140 165 180 190 202 218 263 455 800 1000 1100 1160

Number of Employees

Department Engineer Drafts man Other Total Management & Accounting 10 23 33 Project Management 24 1 25 Process 14 3 17 Piping 26 25 51 Technology 10 4 14 Electrical 15 10 25

Instrumentation & Control

18 7 25 Civil & Structural 17 15 32

Transportation & Infrastructure

141 27 38 206 Architectural 8 1 9 IT & Document Control 8 5 13 Total 296 112 47 455

TEKFEN ENGINEERING – FACTS & FIGURES 750,000+ Engineering Man-hours/year

L

Listed in Design Firms

slide-17
SLIDE 17

BATTLEFIELD - INDUSTRIAL

Oil and Gas Industry Pipelines Chemical & Petrochemical Industry Power Generation Storage & Handling Modular Design Skid-Mounted Solutions

slide-18
SLIDE 18

BATTLEFIELD – BUILDING, TRANSPORTATION & INFRASTRUCTURE

Motorways and Bridges Stadiums Railroads and Tunnels High-Rises Airports Jetties

slide-19
SLIDE 19

PROCESS PLANT LAYOUT & PIPING TECHNOLOGY INSTRUMENTATION & CONTROL ELECTRICAL CIVIL & STRUCTURE TRANSPORTATION & INFRASTRUCTURE ARCHITECTURAL RISK & SAFETY

TEKFEN ENGINEERING SERVICES

slide-20
SLIDE 20

PROCESS

  • Design Services
  • Process Simulation
  • PFD & HMB Preparation
  • Intelligent P&ID Preparation
  • Hydraulic Study, Flow Assurance & Line Sizing
  • Control Philosophy and Cause & Effect chart
  • Value Engineering Studies
  • Specification Preparation
  • Equipment Sizing & Design
  • Technical Support for Procurement
  • Gas Dispersion Analysis
  • Relief System Design and Assessment
  • Flare Network Design and Assessment
  • Balance of Plant Design Activities
  • Assessment of Existing Equipment and Systems
slide-21
SLIDE 21

PLANT LAYOUT & PIPING

  • Design Services
  • Preliminary Concept of Plant Layout, Planning and

Arrangement

  • Equipment Arrangement
  • Basic and Detail Design of All Piping System
  • Piping Arrangements & Isometric Generation
  • Assembly Supervision and As Built Documentation
  • Tie-in Measurements & Pipe Replacement
  • Intelligent Design with 3D Modelling
  • Implementation of Laser Scanning Data
  • Technical Support for Procurement
  • Pipe Stress Analysis according to ASME FEA tools for

nozzles & critical parts

  • Fire Fighting System Design and Hydraulic Calculations
  • Preparation of Fire Fighting Specifications
slide-22
SLIDE 22

TECHNOLOGY

  • Design Services
  • Thermal and Mechanical Design
  • Shell & Tube Heat Exchangers
  • Air Cooled Heat Exchangers
  • Pressure Vessels (Reactors, Columns, Drums)
  • Storage Tanks
  • Rotating Equipment
  • Miscellaneous Equipment
  • Material Selection & Piping Material Specification

Development

  • Technical Support for Procurement
  • Existing Equipment Assessment and Re-rating
slide-23
SLIDE 23

INSTRUMENTATION & CONTROL

  • Design Services
  • Field Instrumentation
  • Control System Design
  • Fire & Gas Detection System
  • Cable Way, Cabling & Accessories
  • Telecom System
  • Weak Current System Design
  • Technical Support for Procurement
  • Detail Engineering
  • Hook Up (Process, Air, Support,

Winterization)

  • Logic / Loop Wiring Diagrams
  • Junction Box Wiring Diagram
  • Control and Panel Room Layouts
  • Cable Way Details
  • Instrument & Pneumatic Layouts
  • HVAC Drawings
  • Instrument List / Cable List / Coil List
slide-24
SLIDE 24

ELECTRICAL

  • Design Services
  • HV/MV/LV Systems Design
  • AC / DC UPS Design
  • Cable Routing Design
  • Load & Cable List Development
  • Electrical Heat Tracing System Design
  • Lighting Design
  • Grounding and Lightning Protection
  • Power System
  • Short Circuit and Load Flow Analysis
  • Transient Stability Analysis
  • Hazardous Area Classification
slide-25
SLIDE 25

TRANSPORTATION & INFRASTRUCTURE

  • Design Services
  • Geotechnical Works
  • Road Design
  • Traffic Simulation
  • Grading Drawings
  • Rolling Stock, Power Supply, Signalization and

Telecommunication Design

  • Viaduct, Tunnel, Under/Over Passes Design
  • Engineering Services for Bridge, Railway and

Subway

  • EIA Reports for Highways and Railways
slide-26
SLIDE 26

CIVIL & STRUCTURE

  • Static & Dynamic Analyses
  • Earthquake Engineering
  • Modal Analyses
  • Time History Analyses
  • Assessment of Existing Structures and Retrofitting
  • Soil-Structure Interaction Analyses
  • Analyses for Special Load Cases
  • Design Services
  • Civil & Structural Design Engineering Services
  • Assessment Strengthening of Existing Structures
  • Structural Steel Workshop Drawings
slide-27
SLIDE 27

ARCHITECTURE & BUILDING SOLUTIONS

  • Design Services
  • Conceptual Design
  • Schematic Design
  • Detail Design / Design Development
  • Shop-drawings / Construction

Drawings

  • Electrical Design
  • Sustainability
  • Fire Engineering
  • HVAC System Design
  • Mechnanical Design
  • Structural Design
  • Multidisciplianary Design

Coordination

  • Technical Support for Procurement
slide-28
SLIDE 28

RISK & SAFETY

  • Safety Life-Cycle Management
  • Risk Based Process Safety Management System for Design
  • Transparency for Safety Related Deliverables & Activities
  • PHA (HAZOP)
  • Target SIL selection
  • SRS writing
  • Proof test generation
  • Cost Analysis
  • Alarm Management
  • Services
slide-29
SLIDE 29

SOFTWARE CAPABILITY

Process

Aspen HYSYS Aspen Flarenet Aspen EDR HTRI Exchanger Thermoflow GT Pro AVEVA PID Diagrams Aspen Energy Anlyzer

Plant & Piping

AVEVA E3D AVEVA Multi Discipline AVEVA PDMS

Sunrise

Pipenet Intergraph CAESAR II HTRI Exchanger Codeware Compress

AME Tank

Technology Instrumentation & Control

AVEVA Instrumentation INtools SmartPlant InstruCalc Bentley Inroads Bentley Microstation Bentley MX - Road AutoDesk Civil 3D

Transportation & Infrastructure Civil & Structure

AutoDesk 3DS Max

AutoDesk Revit AutoDesk Navisworks

Architecture & Building

SAP 2000 Etap Tekla

slide-30
SLIDE 30

MAJOR PROJECT PARTNERS

ABB, UK Amec Foster Wheeler British Petrol Bechtel General Electric KBR Parsons Inc. Honeywell UOP Williams Brot. Petrobas, Brazil Marubeni Mitsubishi Toyo Eng. JGC ILF Consulting, Austria Atlas Copco, Sweden Linde, Germany Bobcok Borsig Power Siemens Uhde GmBH Petrofac, UAE Repsol, Spain Technicas Reunidas Saipem, Italy Salini Impregilo Vinci, France Alstom Air Liquide Sofregaz Spie Batignolles

slide-31
SLIDE 31

MAJOR CLIENTS

TURKEY TÜPRAŞ BOTAŞ Baku Tbilisi Ceyhan Pipeline Co. TANAP Turkish State Railways General Directorate of Highways AKSA Petkim MOROCCO Autoroutes of Morocco OCP SAMIR SAUDI ARABIA QATAR ASHGAL, Ministry of Public Works Uhde GmbH QAPCO, Qatar Petrochemical Co. QP , Qatar Petroleum Qatar Private Engineering Office UAE ADCO(ADNOC) GEORGIA Georgian Pipeline Co. Caspian Pipeline Consortium KAZAKHSTAN Tengizchevroil AGIP KCO Shell KazMunayGas KUWAIT KOC,Kuwait Oil Company Ministy Of Public Works AZERBAIJAN BP Exploration SOCAR AIOC Azerigaz JSC OMAN PDO (Petroleum Development Oman) UZBEKISTAN Uzbekneftegas TURKMENISTAN Türkmengaz IRAQ SCOP NRC RDO Saudi Aramco Ma’den Saudi Arabian Mining Ministry of Agriculture and Water Ministry of Municipal and Rural Affairs Petro Rabigh Sadara Chemical SWCC, Saline Water Conversion

slide-32
SLIDE 32

Competitive Advantages

slide-33
SLIDE 33

Feasibility Study Basic Eng. FEED Detail Eng. Procurement Piping and Equipment Manufacturing Installation

Commissioning

Tekfen Construction Tekfen Manufacturing

  • POWER OF COLLABORATION

Contracting Group Tekfen Engineering

slide-34
SLIDE 34
  • STRONG KNOW-HOW
  • Accomplished projects in various areas for

35 years

  • Assessment of projects through multidisciplinary

approach

  • Hundreds of projects is executed

in oil&gas, industrial plants & terminals, energy & pipeline, transportation & infrastructure industries

  • Comprehensive and coordinated method through

disciplines

  • Proactive and Results oriented approach
  • Cost effective manner
slide-35
SLIDE 35
  • MODULARIZATION CAPABILITY

MODULAR DESIGN

  • Offsite fabricated and assembled
  • Comprised of complete or partial systems
  • Preassembly- partial assembly of typically multi-craft

components into an aseembly

  • Prefabrication- fabrication of typically single-craft

components into a fabricated item

  • Cost Reductions
  • Schedule Reductions
  • Risk Reductions
  • Safety
  • Quality
  • Reduced manpower on site
  • Higher Productivity
slide-36
SLIDE 36
  • DIGITALISATION
  • Proof of Concept
  • System Integration of digital industrial solutions to existing

and potential clients

  • Pilot projects to confirm assumptions and form a best-case

service package for customers and vendors

  • Minimum Viable Product
  • Creation of a minimum viable service to provide solution

integration and engineering with vendor solutions

  • Strict project management, KPI integration and RoI

calculation for Tekfen Engineering

  • Center of Excellence
  • Developing digital culture through engineering and

working as a center of excellence for Tekfen Holding and rival EPCs in digital industrial domain

  • Own digital product and services development through

collected know-how and expertise from partner enabled projects.

slide-37
SLIDE 37

HUMAN CAPITAL

  • Dedicated and experienced team that can

easily identify complexity and pitfalls of a project

  • Sustainable quality by transferring know-how

to young generations

  • Multicultural Human Resource
  • Continuous Investment on Engineering in

terms of Quality and Quantity

  • Office Locations in 3 countries
  • Employees from 8 countries
slide-38
SLIDE 38

ENVIRONMENTAL SUSTAINABILITY

  • As Tekfen Holding, we emphasize on preserving the

capability of the environment to support human life. Developing processes that will lead to businesses becoming completely sustainable in the future is one of our main concern. Tekfen Holding Listed in B Band Climate Change Report

  • Carbon Disclosure Project (CDP) is a non-profit charity that

runs the global disclosure system for investors, companies and cities to manage their environmental impacts. Tekfen Holding Listed in B Band Water Safety Report

slide-39
SLIDE 39

Head Office Premier Kampüs Ofis, Gürsel Mahallesi İmrahor Caddesi B Blok. No:29 Kat:3 34400 Kağıthane / İstanbul / TÜRKİYE T: +90 212 357 03 03 F: +90 212 357 03 09 Baku Office Babek ave., Babek Plaza, 5th floor, AZ1025, Baku-Azerbaijan T: +994 12 488 80 25 Qatar Office Al Fardan Towers, 8th Floor, No::845 West Bay Area, P.O Box: 22917, Doha – QATAR T: +974 3358 4941 bd.engineering@tekfen.com.tr www.tekfenengineering.com

slide-40
SLIDE 40

Thank you for your attention!