Urban Water Cycle Planning Guide Guide INTRODUCTORY SESSION - - PowerPoint PPT Presentation

urban water cycle planning guide guide
SMART_READER_LITE
LIVE PREVIEW

Urban Water Cycle Planning Guide Guide INTRODUCTORY SESSION - - PowerPoint PPT Presentation

Urban Water Cycle Planning Guide Guide INTRODUCTORY SESSION BENDIGO 17 JUNE 2014 Old paradigm, fragmented management Developers BW Business Business Residents SRW LG CMA DOH DEPI DPCD EPA 2 New paradigm integration


slide-1
SLIDE 1

Urban Water Cycle Planning Guide Guide

INTRODUCTORY SESSION BENDIGO 17 JUNE 2014

slide-2
SLIDE 2

Old paradigm, fragmented management

BW Business

Developers

2

CMA

Residents

SRW Business

EPA

LG

DPCD DOH DEPI

slide-3
SLIDE 3

New paradigm – integration

Built Aspects Service aspects

  • Stormwater,
  • WSUD
  • Drinking Water
  • Sewerage
  • Alternative water

Integrated agency approach

3

Natural Aspects

  • Natural drainage
  • waterways, wetlands,

floodplains

Aspects

  • Residential, commercial and

industrial; land use

  • Roads & streetscapes
  • Public Open Space
slide-4
SLIDE 4
  • Drought, population growth,

changing community attitudes – New emphasis on the role and value of water in urban form

  • Shift away from centralised water

Melbourne’s Water Future

4

  • Shift away from centralised water

cycle services

  • Solutions tailored to local context,
  • esp. using local water , WSUD
  • Retrofits in old suburbs
  • WWCM in design in new suburbs
slide-5
SLIDE 5
  • New developments offer best opportunity

for better liveability

  • Water cycle aspects can be designed to

enhance liveability – Recreational links – Water in the landscape

WWCM and new developments

5

– Water in the landscape – Nature in suburbia – Green open space, canopy cover – Stormwater detention, treatment, reuse

  • Need to design new suburbs with

‘water in mind’

slide-6
SLIDE 6
  • Complex planning approvals process
  • Water cycle aspects are just one matter
  • Developers/consultants make many

decisions

Development planning

6

decisions

– What options; who to consult; what rules apply

  • Many issues arise because of poor

communication between players

slide-7
SLIDE 7

Challenges for water/urban planning

Lack of understanding of IWCM by developers Lack of clarity for IWCM in policy &regulations Council resistance due to unknown O&M

7

&regulations Conflicting views and lack of coordinated decision making IWCM solutions not one-size-fits all unknown O&M cost implications

slide-8
SLIDE 8
  • Online one-stop shop

for developers, consultants and planners

  • IWCM in planning &

Urban Water Cycle Planning Guide

  • IWCM in planning &

design of greenfield developments

  • Precinct scale

8

slide-9
SLIDE 9

The WWCM ‘Flowpath’

  • 1. Waterways and floodplains
  • 2. Major Drainage
  • 3. Land Use, Roads, Public Open Space

Built Aspects (3&4) Service aspects (5,6 &7)

9

  • 4. Water Sensitive Urban Design
  • 5. Drinking Water Servicing
  • 6. Sewerage Servicing
  • 7. Alternative, fit-for- purpose water

Natural Aspects (1 &2) (3&4)

slide-10
SLIDE 10

Concept Functional Detailed

3 Modules (Stages)

  • High level
  • Ideas
  • Consultation
  • More detail
  • Options
  • Agreement
  • Final design
  • Decisions
  • Approval

10

slide-11
SLIDE 11
  • Early consultation –

avoids wasting time and money on ‘dud’ options

  • Aligned with planning

Benefits

Aligned with planning approvals process

  • Agreed format by

agencies

11

slide-12
SLIDE 12

Outputs – IWCM Plan

12

slide-13
SLIDE 13

Urban Water Planning Guide Training

slide-14
SLIDE 14

E x i s t i n g a n d P l a n n e d C o n d i t i o n s

slide-15
SLIDE 15

E n c u m b e r e d O p e n S p a c e

slide-16
SLIDE 16

G r e e n l i n k s

slide-17
SLIDE 17

A c t i v e o p e n s p a c e

slide-18
SLIDE 18

L o c a l o p e n s p a c e

slide-19
SLIDE 19

Entering the site

Type in http://iwcm3.grindstone.com.au Go to ‘register’ and create your own log in Go to ‘register’ and create your own log in Once logged in, you will be taken to Projects screen

19

slide-20
SLIDE 20

The Site

20

slide-21
SLIDE 21

The Site

21

slide-22
SLIDE 22

Create new project

Click on create a new project Fill in the details. The shire/council menu determines who the who the information will be sent to.

22

slide-23
SLIDE 23

The Guide

23

slide-24
SLIDE 24

Insert Text

Click on the objective and a text box will appear The question for the

  • bjective at this stage

24

Input your text here

slide-25
SLIDE 25

Insert Text

25

Extra information to help with the question

slide-26
SLIDE 26

Insert Text

26

The deliverables i.e. what is expected with the answer to the question

slide-27
SLIDE 27

Case studies and Resources

  • References - the relevant standards
  • Case studies – Good

examples of the deliverables for the question

  • References - the relevant standards

and contacts. Ie Infrastructure Development Manual or the Barwon Water contact for servicing queries.

27

slide-28
SLIDE 28

Ask a question

  • When a question is asked

here.

  • The agencies will be notified

via email

  • They will then respond
  • This will apear below the
  • This will apear below the

question

28

slide-29
SLIDE 29

Add a document

There is provision for attaching maps. Plans, reports etc at the bottom of each aspect. Click on choose file Select relevant document Click add attachment Click add attachment There is no limit to the size or amount of attachments

29

slide-30
SLIDE 30

Printing module

  • At each stage there is the
  • pportunity to print the

project as a PDF at anytime.

  • It is suggested that the

project be printed before submission as a record of answers. answers.

30

slide-31
SLIDE 31

Functional and Design Modules

  • There is an ability to go back and view answers to previous stages of the

project

  • These answers cannot be changed, just viewed.

31

slide-32
SLIDE 32

Agency login

  • Agency Staff will see a different screen when they login.
  • All projects within their jurisdiction will be listed

32

slide-33
SLIDE 33

Agency login

  • Agency staff have the ability to make a comment about a response or

question so that only other agency staff can see.

  • A response will only be published once a coordinated response has been

agreed

  • Once all objectives are complete the project can then be moved to the

next module.

33

slide-34
SLIDE 34

The Case Study

  • A basic example of what a developer can expect to answer
  • An example of what information an agency staff may receive.
  • http://iwcm4.grindstone.com.au/
  • Login – uwcp
  • Password – uwcp123
  • Password – uwcp123

34