US 101 Elw ha River Bridge MOVING FORWARD CHRIS BRUNING, Elwha - PowerPoint PPT Presentation
US 101 Elw ha River Bridge MOVING FORWARD CHRIS BRUNING, Elwha Project Manager STEVE ROARK Port Angeles Project Engineer Asst. Regional Administrator Feb. 20, Feb. 21, 2018 Bridge History 1913 - Elwha Dam built 1926 - 3-span,
US 101 Elw ha River Bridge MOVING FORWARD CHRIS BRUNING, Elwha Project Manager STEVE ROARK Port Angeles Project Engineer Asst. Regional Administrator Feb. 20, Feb. 21, 2018
Bridge History 1913 - Elwha Dam built 1926 - 3-span, 388-foot concrete arch bridge built 1927 - Glines Canyon Dam built 1954 - Widened 20-foot bridge to 28 feet 2012 – Elwha Dam removed 2014 – Glines Canyon Dam removed 2 2
Changing River Conditions Dec. 3, 2014 Nov. 14, 2014 3
Resultant Erosion 4
Ongoing Monitoring Tilt meters Crack meters Water flow Visual observations 5
Imaging
Pier Protection 7
Design Progress 8
9
Proposed Alignment 10
Parking, w ater access 11
Estimated project timeline Open Timeline contingent on bridge to acquiring NEPA, traffic by easements, permits fall 2020 Contractor Current hired 0 - 12 months* work 12 – 18 months* Bridge design, Year 1 construction. Year 2 construction. Bridge Contract ad environmental, Mobilize, preliminary structure, associated and award. land acquisition, roadway work, second fish- Begin road/bridge work, first Celebrate! permitting, window to finalize in-water construction fish window for in-water programming. work. summer 2019. work. *If conditions require WSDOT to close the existing bridge for public safety, we will choose the most expedient method to re-establish passage across the Elwha River. That may result in a change in bridge design and location . 12
Staying informed 1-888-633-4005 (Elwha River Bridge hotline) ElwhaRiverBridge.com GovDelivery/Granicus (self-subscription service) Traditional/social media @wsdot_Tacoma facebook.com/wsdot (wsdot.wa.gov) wsdot/blog.blogspot.com (wsdot.wa.gov) Youtube.com/wsdot On-line comment form 13
Other upcoming construction
Questions Claudia Bingham Baker Olympic Region Communications Manager bakerc@wsdot.wa.gov 360-357-2789 15