SLIDE 1 Introductions: Bill Nemser, Town Planner of Maynard Staff and CBA Landscape Architects LLC Project Schedule and Overview Community Meeting 2 Recap Design Community Input and Feedback Future Schedule and Closing Remarks
Veterans Memorial Park Meeting Agenda
Location: Maynard Public Library Community Meeting 3: April 21, 2016 @ 7pm
SLIDE 2 Introductions: Bill Nemser, Town Planner of Maynard Staff and CBA Landscape Architects LLC Project Schedule and Overview Community Meeting 2 Recap Design Community Input and Feedback Future Schedule and Closing Remarks
Veterans Memorial Park Meeting Agenda
Location: Maynard Public Library Community Meeting 3: April 21, 2016 @ 7pm
SLIDE 3 Introductions
Town of Maynard
Town Planner: Bill Nemser
CBA Landscape Architects LLC
Principal-In-Charge: Clara Batchelor Staff Landscape Designer: Jessica Choi
SLIDE 4
Project Schedule
SLIDE 5
- Meeting 1 (January 7, 2016 at 7:00 PM): Present Site Analysis and Precedents, gather community
input, and develop program wish list to guide Schematic Designs for future meetings.
- Meeting 2 (February 25, 2016 at 7:00 PM): Present Schematic Design Alternatives based on first
meeting input. Community review and discussion, with the goal of developing a final Preferred Design Plan.
- Meeting 3 (TBA): Present Definitive Design based on community discussion at Meeting 2. With
community input, discuss and clarify final design, phasing, and funding of park.
Veterans Memorial Park Project Milestones
SLIDE 6
MEETING 2 RECAP
SLIDE 7
Context + Connections
SLIDE 8
Existing Conditions
SLIDE 9
Circulation & Connections
SLIDE 10
Existing Site Photos
SLIDE 11
Memorial Area
SLIDE 12
Performance Area
SLIDE 13
SLIDE 14
SLIDE 15 Looking southwest toward “Nason St. Parcel”
Relocate utility pole?
SLIDE 16 Looking toward Summer St from “Nason St. Parcel”
Relocate utility pole?
SLIDE 17
Panoramic view from Nason St – gentle slope into the park
SLIDE 18
Park gently slopes downwards from Summer St/Nason St
SLIDE 19
“the Basin”
SLIDE 20
“the Basin”
SLIDE 21
“the Basin” at night
SLIDE 22
Electrical Power and Lighting
SLIDE 23 Holiday/Event Lighting
Holiday Lights Use this corner's trees for holiday lighting?
SLIDE 24
Meeting 2 Design Options
SLIDE 26 Option 2A – Plan
SLIDE 27 Option 2B – Plan
SLIDE 29 Meeting 2 Feedback Summary:
- Increase pedestrian safety (add new sidewalk)
- More curvilinear pathways
- Performance space should be multi-purpose
- More brick paving
- More flowering plants
- Create a more defined space for flagpole
- Musical Fence may be too noisy
- Remove building to continue level sidewalk, but keep charging stations
- Enlarge green space if possible
SLIDE 30
Context + Connections
SLIDE 31
Existing Conditions
SLIDE 32
Circulation & Connections
SLIDE 33
FINAL DESIGN
SLIDE 34
Final Design
SLIDE 35
Final Design – New Connections/Circulation
SLIDE 36
Final Design – Phase 1
SLIDE 37
Final Design – Phase 2
SLIDE 38
Final Design
SLIDE 39
Key Plan - Long Section and Elevation
SLIDE 40
Long Section and Elevation
SLIDE 41
Cross Sections A and B
SLIDE 42
Cross Sections C and D
SLIDE 43
Looking East (Before)
SLIDE 44
Looking East (After)
SLIDE 45 Design Elements: Seating and Lighting
Twig Bench Picnic Table Metal Ribbon Bench Traditional Lightpost
SLIDE 46 Design Elements: Play
Rain Maker by Goric Rolling Bells by Goric
SLIDE 47
Decorative Fence Studies
SLIDE 48
Opportunity for Expansion of Park
SLIDE 49
Community Input And Comments