and SHIFTRAIL European Commission DG RTD Transport Liam BRESLIN - - PowerPoint PPT Presentation

and shift rail
SMART_READER_LITE
LIVE PREVIEW

and SHIFTRAIL European Commission DG RTD Transport Liam BRESLIN - - PowerPoint PPT Presentation

Academic Research in Horizon2020 and SHIFTRAIL European Commission DG RTD Transport Liam BRESLIN Shift2Rail Conference Athens, 19 February 2014 Rail research in FP7 Horizon 2020 new approach to R&I Role of


slide-1
SLIDE 1

Academic Research in Horizon2020 and SHIFT²RAIL

European Commission

DG RTD – Transport Liam BRESLIN

Shift2Rail Conference

Athens, 19 February 2014

slide-2
SLIDE 2
  • Rail research in FP7
  • Horizon 2020 – new approach to R&I
  • Role of universities, research institutes and SMEs in rail

research in H2020

slide-3
SLIDE 3
  • 50 rail research projects

 Rolling stock  Infrastructure  Traffic Management & Control  Safety/Security  Freight  Education and Training Actions

  • Funding FP7: €155M
  • SMEs = 16% of funding
  • Academia = 38 % of funding

Rail R&I in FP7

slide-4
SLIDE 4

Track Wheels/Axles Rail/Wheel Dynamics Noise & Vibration Train Construction Aerodynamics Brakes Train Intelligence Bridges Safety Energy Savings Electric Current/ Overhead Line Cab Design Signalling

EU-funded Rail Research

slide-5
SLIDE 5

FP7 Project Cleaner-D

  • Cleaner-D – Clean European rail – diesel
  • Start: Apr 2011, Duration: 56 months,
  • EC-contribution: €7,8 Mio

Budget: €12,9 Mio

  • Participating Universities/Research centers : 8
  • Objectives :

 develop, improve and integrate emissions reduction technologies for diesel locomotives and rail vehicles.

slide-6
SLIDE 6

FP7 Project CAPACITY4RAIL

  • CAPACITY4RAIL – Increased Capacity for Rail Networks through

enhanced infrastructure and optimised operations

  • Start: Oct 2013, Duration: 48 months,
  • EC-contribution: €10 Mio

Budget: €15Mio

  • Participating Universities/Research centers : 18
  • Objectives

 CAPACITY4RAIL aims at paving the way for the future railway system, delivering coherent, demonstrated, innovative and sustainable solutions for:

  • Track design
  • Freight
  • Operation and capacity
  • Advanced monitoring
slide-7
SLIDE 7

FP7 Project MARATHON

  • MARATHON – Make Rail The Hope for protecting Nature
  • Start: Apr 2011, Duration: 42 months,
  • EC-contribution: €2,7 Mio

Budget: €4,5 Mio

  • Participating Universities/Research centers : 2
  • Objectives :

 doubling freight trains length in Europe (from 750m to 1500m), in order to improve track capacity and reduce running costs. The first demonstrator successfully run in January a 1,5 km long train between Lyon and Nîmes, loaded with real freight.

slide-8
SLIDE 8
  • Low success to stimulate technology innovations due to:

 Insufficient project coordination  risk of overlaps and/or of generating uncoordinated or redundant technologies  Lack of system-wide approach with limited or uncoordinated participation of actors from the full rail value chain  Limited market uptake of innovations with EU funding focused on pre- competitive innovation at low Technology Readiness Levels and "estranged" from market needs

  • Limited leverage effect (30% of private funding on average)

Rail R&I under FP7

slide-9
SLIDE 9
  • €70+ billion research and

innovation funding programme for 2014-2020 centred around 3 major priorities

  • New approach to EU-funded

Research and Innovation (R&I), in line with Europe 2020 and the Innovation Union

Excellent science Societal challenges Industrial leadership

Horizon 2020

slide-10
SLIDE 10
  • A single programme bringing together EU funded R&I (current FP +

CIP + EIT)

  • Linking research to innovation by providing seamless and coherent

funding from idea to market

  • More support for activities close to the market, including technical

demonstrators, leading to a direct economic stimulus

  • Simplified access for businesses, universities, institutes in

all EU countries and beyond

  • A strong challenge-based approach, allowing applicants to have

considerable freedom to propose innovative solution

  • Strong SME involvement in all R&I activities
  • Partnerships on the basis of Articles 185 and 187 of the Treaty to be

continued and strengthened further

Horizon 2020 – New approach to R&I

slide-11
SLIDE 11

H2020 Public Private Partnerships H2020 - PPPs Innovative Medicines Initiative (IMI)2 Fuel Cells and Hydrogen (FCH)2 Clean Sky (CS)2 Bio-based industries (BBI) Electronic Components and Systems for European Leadership (ECSEL) European Air Traffic Management System - SESAR Rail Research (Shift2Rail)

slide-12
SLIDE 12

Priority 3 : Societal challenges (€ million, 2014-2020)

Health, demographic change and wellbeing 7 472 Food security, sustainable agriculture, marine and maritime research & the Bio-economy 3 851 Secure, clean and efficient energy 5 931 Smart, green and integrated transport 6 339 Climate action, resource efficiency and raw materials 3 081 Inclusive and reflective societies 1 309 Secure societies 1 695 Science with and for society 462 Spreading excellence and widening participation 816

Horizon 2020 – Funding for Transport

slide-13
SLIDE 13
  • 6339 M € for 7 years 2014-2020
  • 50/50 JTIs/collaborative calls

 Clean Sky  SESAR  Fuel Cells & Hydrogen (contribution)  Shift2Rail

  • 867 M € for WP 2014-15

Transport challenge - Budget

slide-14
SLIDE 14
  • Joint priority setting in a Strategic Master Plan developed jointly by the

Commission and the rail sector in the Joint Undertaking

  • Holistic view of the rail system taking into account all railway

subsystems and their interactions

  • Integration and coordination of all rail R&I activities to ensure

continuity and avoid fragmentation

  • Broad stakeholder participation and sustained networks: Gather all

the key players across Europe in partnerships to ensure a system-wide approach to innovation.

Shift2Rail - Joint vision and holistic approach

slide-15
SLIDE 15
  • forward-looking strategic roadmap of rail research and innovation in

Europe.

  • identify key priorities and the essential operational and technological

innovations required from ALL stakeholders (including operators, infrastructure managers, SMEs, Academia, etc.)

  • 1st draft in March/April 2014
  • Public consultation will be organised in April/May – Get involved!

Shift2Rail Strategic Master Plan

slide-16
SLIDE 16
  • Participate in 1st open calls in H2020
  • Become Associated Member in Shift2Rail (individually or as a member
  • f a consortium)
  • Become subcontractor of a Founding Member or Associated Member
  • Apply for funding through fully open calls within Shift2Rail (at least

30% of the EC-funding for Shift2Rail)

  • Get involved at a more strategic level through dedicated Shift2Rail

working groups

Opportunities for Academia in Rail Research in H2020

slide-17
SLIDE 17

Policy Research and Innovation

RAIL – 1st call in H2020

TOPICS:

  • Intelligent Infrastructure – MG2.1
  • Smart Rail Services – MG2.2
  • New generation of rail vehicles – MG2.3

All are 2 stages for 2014 Projects will contribute to the objectives of the envisaged 'Shift2Rail' initiative

Call 'Mobility for Growth'

17

slide-18
SLIDE 18

Transport

Urban Mobility

  • MG.5-3-2014. Tackling urban road congestion
  • MG.5-3-2014. Demonstrating and testing innovative solutions for cleaner

and better urban transport and mobility Intelligent Transport Systems

  • MG.7-1-2014. Connectivity and information sharing for intelligent mobility

Infrastructure

  • MG.8-1-2014. Smarter design, construction and maintenance
  • MG.8-2-2014. Next generation transport infrastructure: resource efficient,

smarter and safer

Other Topics relevant for Rail Research

slide-19
SLIDE 19

Thank you for your attention!