Entry Point Issues Standards and Requirements Gareth Mills Biomethane Workshop August 6 th 2010 Entry Capacity SSC D12 Obligation to provide capacity that is available but on a Non Firm basis System often cannot accept


slide-1
SLIDE 1

Gareth Mills Biomethane Workshop August 6th 2010

Entry Point Issues – Standards and Requirements

slide-2
SLIDE 2

2

Entry Capacity

  • SSC D12 – Obligation to provide capacity that is

available – but on a Non Firm basis

  • System often cannot accept constant flows across

the year (Constraints at times of low flow – Warm Summer Nights – No Domestic Heating Load)

  • Firm Capacity rights likely to require significant

system reinforcement

  • Potential Future Options – Compression
slide-3
SLIDE 3

3

Gas Quality

  • GDN Obligation to comply with requirements of

GSMR Schedule 3

  • Ability to meet current requirements (Oxygen)
  • Exemptions from GSMR available but limited
  • Additional requirements identified via risk

assessment

  • Calorific Value & Propanation
  • Who is Responsible? – GDN, Producer, Gas Shipper?
slide-4
SLIDE 4

4

Measurement Equipment

  • Gas Quality Measurement
  • Standards & specification of kit to ensure compliance with

GSMR Requirements

  • Ofgem Directed Site
  • Metering – Fiscal Standard
  • Odorisation – Required
  • Compliance with current legislation means that

equipment costs are significant for small scale entrants

slide-5
SLIDE 5

5

Ownership & Funding

  • Range of Options for Ownership
  • NGN intend to make as much as possible contestable
  • NGN ownership limited to Odorisation and Valve
  • Under current arrangements DN Entrant pays for

all Capex required

  • Options for changes to charging methodology
  • Regulatory funding via PCR (Socialisation of Costs)