Ministry of Water and Environment Joint Technical Review 2020 Undertakings no. 10 Disseminate the sanitation monitoring indicators, measurement framework and develop an improved MIS system (digital based) by FY 2019/20 1 Detail of


slide-1
SLIDE 1

Ministry of Water and Environment

Joint Technical Review 2020

Undertakings no. 10 Disseminate the sanitation monitoring indicators, measurement framework and develop an improved MIS system (digital based) by FY 2019/20

1

slide-2
SLIDE 2

Detail of Undertaking no.10

Naigaga Martha (MWE-RWSD)

  • Eng. Twinomucunguzi Felix (MWE-

UWSSD)

Kyomugisha Trinah (MWE-UWSSD)

John Kiberu (MWE-UWSSD)

Ivan Biiza (MWE-WLESD)

Rehema Aanyu/ (UWASNET)

Singh Head WASH (UNICEF)

Wilberforce Kimezere (UNICEF)

Wandera Steven (UNICEF)

Abisa Joseph (MoH)

Kalyeebi Peter (MOH)

Akonya Martin (MWE)

Chaired by:

Naigaga Martha

2

Overseeing Committee

slide-3
SLIDE 3

Detail of Undertaking no.10

Secretariat

Rural Water Supply and Sanitation Department (RWSSD)

  • No. of meetings held

Three (03)

3

slide-4
SLIDE 4

Progress in achieving outputs

Procurement of consultant for Development of the improved MIS system with support from UNICEF has been concluded.

Contract signed with Advanced Geospatial Solutions (AGS) on 8th June 2020.

4

slide-5
SLIDE 5

Planned Actions and progress

Development of MIS for sanitation still at infancy stage

Pre-inception meetings have been held with MoWE and MoH AGS was introduced to the key contact persons, AGS presented their rough understanding of the task and general

plans

Scoping by the Consultant is ongoing to gather user requirements Consultative meetings with key contact persons are ongoing

5

slide-6
SLIDE 6

Related activities / processes

  • Dissemination of sanitation monitoring indicators and

measurement framework to districts and CSOs with support from PLAN Uganda was done in 3 districts of Kamuli, Nebbi and Buyende and is still on-going.

6

slide-7
SLIDE 7

Key Challenges

 Delays in the procurement process due to COVID 19  Limited Financial Resources to support dissemination of

the performance measurement framework and monitoring indicators

7

slide-8
SLIDE 8

Next Steps

 Carry over the undertaking to next FY 2020/2021  Complete development of the MIS system.  Disseminate

and build capacity

  • f

District Local Governments and CSOs on use of the MIS

 Disseminate

the performance indicators to local governments and other stakeholders