Peninsula Clean Energy Board of Directors Meeting August 27, 2020 - - PowerPoint PPT Presentation

peninsula clean energy board of directors meeting
SMART_READER_LITE
LIVE PREVIEW

Peninsula Clean Energy Board of Directors Meeting August 27, 2020 - - PowerPoint PPT Presentation

Peninsula Clean Energy Board of Directors Meeting August 27, 2020 Agenda Call to order / Roll Call Public Comment Action to set the agenda and approve consent items 2 Regular Agenda 1. Chair Report (Discussion) 3 Regular


slide-1
SLIDE 1

Peninsula Clean Energy Board of Directors Meeting

August 27, 2020

slide-2
SLIDE 2

2

  • Call to order / Roll Call
  • Public Comment
  • Action to set the agenda and approve consent items

Agenda

slide-3
SLIDE 3

3

Regular Agenda

  • 1. Chair Report (Discussion)
slide-4
SLIDE 4

4

Regular Agenda

  • 2. CEO Report (Discussion)
slide-5
SLIDE 5

5

  • Staffing Update
  • COVID-19 Update
  • Load Impact Analysis
  • Heatwave Impact
  • Power On Peninsula Update
  • Reach Codes Update
  • Joint Rate Mailer Update
  • IRP Update
  • CalCCA Elected Officials Meeting
  • Update on “Meet and Greets”
  • Upcoming PCE Meetings

Today’s Updates

slide-6
SLIDE 6

6

  • We currently have one open position for a Data Manager.
  • With continued uncertainty and changing conditions with COVID,

PCE staff will continue to work-from-home through end of 2020

  • Providing up to $500 per staff member for additional equipment needs at

home

  • Providing $50/month stipend to all staff to upgrade their internet connections

Staffing Updates

slide-7
SLIDE 7

7

  • Overall PCE load
  • Monthly Load Changes
  • Load Changes and Shapes by Customer Type

Thank you to the power resources team for this analysis!

COVID-19 Load Impact Analysis

slide-8
SLIDE 8

8

  • April-July 2020 compared to April-July 2019:
  • 7% decrease in Total PCE load compared to same period in 2019.
  • Around 16% decrease in medium/large commercial load, and 20% decrease in small commercial load
  • Around 9% increase in residential load

PCE Load after Shelter-in-place order

1,220,090 1,134,571

2019 2020

slide-9
SLIDE 9

9

  • Significant decrease in PCE’s monthly load starting March 2020:
  • 4% decrease in March 2020 compared to March 2019
  • 7%, 6%, 8%, 7% decrease in April, May, June, and July of 2020 compared to same months in 2019

Monthly Load

337k 339k 310k 304k 318k 309k 294k 273k 301k 282k 311k 286k 315k 293k

slide-10
SLIDE 10

10

Monthly Load Changes by Customer Class

  • Significant decrease in C&I load, increases in residential load in each month

compared to same month in 2019.

slide-11
SLIDE 11

11

Load Shapes (C&I)

  • 2020 shapes (dashed lines) are scaled down compared to 2019.
  • 10

20 30 40 50 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

Industrial

2019-04 2019-05 2019-06 2019-07 2020-04 2020-05 2020-06 2020-07

  • 10

20 30 40 50 60 70 80 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

Small Commercial

2019-04 2019-05 2019-06 2019-07 2020-04 2020-05 2020-06 2020-07

  • 20

40 60 80 100 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

Medium Commercial

2019-04 2019-05 2019-06 2019-07 2020-04 2020-05 2020-06 2020-07

  • 20

40 60 80 100 120 140 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

Large Commercial

2019-04 2019-05 2019-06 2019-07 2020-04 2020-05 2020-06 2020-07

slide-12
SLIDE 12

12

Load Shapes (Residential)

  • 2020 residential load shapes (orange lines) have changed compared to 2019 shapes (blue lines):
  • Smaller morning peak
  • No drop-off during mid-day

50 100 150 200 250 300 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

April

2019 2020

50 100 150 200 250 300 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

May

2019 2020

50 100 150 200 250 300 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

June

2019 2020

  • 50

100 150 200 250 300 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

July

2019 2020

slide-13
SLIDE 13

13

PCE Load Shapes

100 200 300 400 500 600 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

April

2019 2020

100 200 300 400 500 600 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

May

2019 2020

100 200 300 400 500 600 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

June

2019 2020

  • 2020 PCE load shapes (orange lines) have scaled down compared to 2019

shapes (blue lines)

  • 100

200 300 400 500 600 1 3 5 7 9 11 13 15 17 19 21 23 Load (MWh) Hour

July

2019 2020

slide-14
SLIDE 14

14

  • Thank you for getting the word out to your constituents to conserve energy

during the heat wave

  • Friday, August 14:
  • 6:36 pm - CAISO ordered IOUs to shed 500 MW of load;
  • 6:46 pm - CAISO ordered IOUs to shed additional 500 MW of load
  • 7:56 pm - CAISO ordered load to be restored
  • SMC impact from rolling blackouts:
  • Affected 33,868 customers in San Mateo, west side of Hillsborough, Emerald Hills, Highlands

neighborhood, Foster City and portions of Burlingame

  • Power out at 6:38 pm; power restored at 7:45 pm
  • Affected 60 customers in Belmont
  • Power out at 7:30 pm; power restored at 8:03 pm
  • Saturday, August 15
  • 6:25 pm - CAISO ordered IOUs to shed 470 MW of load
  • 6:47 pm - CAISO ordered load to be restored
  • No SMC customers affected

Heatwave and Rolling Blackouts

slide-15
SLIDE 15

15

Daily Load in August

894 971 922 867 868 967 970 937 1,071 1,018 892 981 1,003 1,048 1,165 1,218 1,221 1,055 1,001 1,252 1,250 1,262 1,344 1,499 1,273 1,177 1,404 1,446 1,428 1,501 1,512 1,253 1,198 1,581 1,552 1,569 1,688 1,902 1,514 1,417 1,817 1,827 2,127 2,186 2,223 2,010 1,982 2,259 2,234 2,254 2,400 2,666 2,410 2,355 2,548 2,555 3,827 3,690 3,719 3,874 4,064 3,968 3,853 3,913 4,312 5,174 5,410 5,395 4,967 5,037

13% 27% 26% 24% 17% 21% 9,588 9,704 9,732 9,199 9,246 10,167 9,994 10,066 10,945 12,392 11,628 11,452 11,872 12,044 20 40 60 80 100 120 2,000 4,000 6,000 8,000 10,000 12,000 14,000

8/5/2020 8/6/2020 8/7/2020 8/8/2020 8/9/2020 8/10/2020 8/11/2020 8/12/2020 8/13/2020 8/14/2020 8/15/2020 8/16/2020 8/17/2020 8/18/2020 Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Temperature (F) Load (MWh)

Streel Lights-Other Agricutural Residential Large Commercial Medium Commercial Small Commercial Industrial Max Temp.

slide-16
SLIDE 16

16

Day-Ahead/Real Time DLAP Prices

200 400 600 800 1000 1200 1400

8/13/2020 0:00 8/13/2020 6:00 8/13/2020 12:00 8/13/2020 18:00 8/14/2020 0:00 8/14/2020 6:00 8/14/2020 12:00 8/14/2020 18:00 8/15/2020 0:00 8/15/2020 6:00 8/15/2020 12:00 8/15/2020 18:00 8/16/2020 0:00 8/16/2020 6:00 8/16/2020 12:00 8/16/2020 18:00 8/17/2020 0:00 8/17/2020 6:00 8/17/2020 12:00 8/17/2020 18:00 8/18/2020 0:00 8/18/2020 6:00 8/18/2020 12:00 8/18/2020 18:00 8/19/2020 0:00

Price ($/MWh) DA RT

Because we were

  • ver-hedged, the

financial impact on PCE was $700K for the week, rather $4.9 million

slide-17
SLIDE 17

17 17

Power On Peninsula: Update

  • Offering clean backup power primarily through solar+battery or battery storage
  • nly at low or no cost for renters and homeowners
  • Priority customers: High Fire Threat Districts, affected by previous PSPS

events, low income/disadvantaged communities, CARE/FERA, Medical Baseline Update as of today:

  • GoalZero delivered 75 batteries to Hassett last week
  • PCE has qualified 41 customers to receive 43 batteries
  • To date, 24 batteries delivered

PLUS $5000 donated to Puente de la Costa Sur for hotel vouchers for those displaced by wildfire evacuations.

slide-18
SLIDE 18

18 18

San Mateo County Reach Codes Update

Member Agency Reach Code Status Building (proposed) EV

Brisbane Adopted Electric w/ exceptions MUD 1xL2/ unit Burlingame Adopted Electric w/ exceptions PCE model code (variant) Menlo Park Adopted Electric w/ exceptions (existing EV code) Pacifica Adopted Electric w/ exceptions (existing EV code) County of San Mateo Adopted Electric w/ exceptions PCE model code San Mateo Adopted Electric preferred Increase EV capable San Carlos Adopted Pre-wiring on single-family homes Portola Valley 1st reading TBD (Electric w/ exceptions) (existing EV code) Redwood City 1st reading Sept 14 (Electric w/ exceptions) PCE model code East Palo Alto Study Session Sept 1 (Electric w/ exceptions) PCE model code Belmont, Colma, Daly City, Hillsborough Letter of Intent, Council Briefing Millbrae, San Bruno Letter of Intent Foster City, Half Moon Bay Council Briefing South SF No Action Atherton, Woodside Declined

Santa Clara County Adopted: 11 In-Progress: 4

New

slide-19
SLIDE 19

19

Joint Rate Mailer Update

  • Electronic copies distributed on Monday
  • Mail copies dropped on Monday and should be

received today or tomorrow

  • PG&E distributed the email version to 100,000+

Peninsula Clean Energy customers

  • We reviewed all proofs and everything was

correct.

  • During PG&E’s process to send the emails, they

misspelled “Peninsula” as “Pennisula” in the

  • email. However, our logo remains correctly

spelled in the email.

slide-20
SLIDE 20

20

IRP Update

  • PCE submission to CPUC on Tuesday, Sept 1
  • Submitting following scenarios:
  • 46 MMT Conforming Portfolio
  • (within 1% of CPUC GHG emissions target)
  • 38 MMT Conforming Portfolio A
  • (within 1% of CPUC GHG emissions target)
  • 38 MMT Conforming Portfolio B
  • (>30% cleaner than CPUC’s GHG emissions target)
slide-21
SLIDE 21

21

IRP PORTFOLIOS (2030)

46 MMT Conforming Portfolio 38 MMT Conforming Portfolio A 38 MMT Conforming Portfolio B Existing Li-Ion 147 147 147 Solar 400 400 400 Wind Small Hydro 12.5 12.5 12.5 New Li-Ion 350 350 350 Solar 450 650 750 Wind 180 205 300 GHG (MMT) 0.626 0.498 0.347

CPUC GHG MMT Target 0.630 0.503 0.503

slide-22
SLIDE 22

22

Local Elected Officials Subcommittee held on August 21

  • Board members attended from PCE, CPA, RCEA, MCE, Clean

Energy Alliance (Carlsbad-Solana Beach-Del Mar )

  • Discussed PCIA trigger
  • Develop one-pager for August 27 PHC on San Diego PCIA

Trigger Application

  • CalCCA follow-up
  • Longer-term strategy for next legislative session

CalCCA Updates

slide-23
SLIDE 23

23

“Meet and greets” with California Public Utilities Commission (CPUC) commissioners and attending board members:

  • Commissioner Genevieve Shiroma, August 28, 9:00 am
  • Jeff Aalfs, Rick DeGolia, Daniel Yost
  • Commissioner Martha Guzman-Aceves, Sept 3, 1:00 pm
  • Jeff Aalfs, Rick DeGolia
  • Office of Commissioner Liane Randolph, Sept 4, 10:30 am
  • Commissioner Cliff Rechtschaffen, Sept 4, 1:00 pm
  • Rick DeGolia
  • President Marybel Batjer, Sept 16, 3:00 pm

Meet and greets - CPUC

slide-24
SLIDE 24

24

“Meet and greets” with California Energy Commission (CEC) commissioners and attending board members:

  • Commissioner Janea Scott, Sept 10, 11:30 am
  • Commissioner Karen Douglas, Sept 16, 4:00 pm
  • Chair David Hochschild, Sept 17, 10:30 am
  • Commissioner Andrew McAllister, Sept 17, 2:00 pm
  • Commissioner Patty Monahan, TBD

Meet and greets - CEC

slide-25
SLIDE 25

25

These meetings will continue to be held by video/teleconference

  • Citizens Advisory Committee:
  • September 10 at 6:30 p.m.
  • Executive Committee:
  • September 14 at 8:00 a.m.
  • Board of Directors Annual Retreat:
  • Saturday, September 26 at 8 or 9:00 a.m.

Upcoming Meetings

slide-26
SLIDE 26

26

Regular Agenda

  • 3. Citizens Advisory Committee Report

(Discussion)

slide-27
SLIDE 27

27

Regular Agenda

  • 4. Audit and Finance Committee Report

(Discussion)

slide-28
SLIDE 28

28

  • 5. Approve Small Business COVID-19 Bill Credit

and San Mateo Community Fund Donation (Action)

Regular Agenda

slide-29
SLIDE 29

Small Business COVID Relief Proposal

Board Meeting August 27, 2020

slide-30
SLIDE 30

30

  • Many small businesses throughout

San Mateo County still closed

  • Businesses that are open have

decreased revenues and increased costs

  • Energy costs remain an ongoing

monthly obligation

Small Business Economic Impacts due to COVID

slide-31
SLIDE 31

31

  • Propose $250 bill credits for up to 6,000 qualifying

small businesses who respond to PCE offer (maximum $1.5 million)

  • Letters to be sent out to A1/B1 and A6/B6 customers

with 1 or 2 accounts (~12,500 customers)

  • Businesses would need to respond via a web form

and answer a few questions as well as provide contact information

  • Credits would be issued within 1-2 billing cycles

Bill Relief Proposal

slide-32
SLIDE 32

32

  • SVCE ran a similar program from May 20th - July 31st

for up to 4,000 customers

  • ~10,000 customers were sent 2 letters approx. 30

days apart

  • So far, just under 3,000 customers have responded
  • One final communication is going out via email to

remaining qualified customers

Results of SVCE Small Business Credit

slide-33
SLIDE 33

33

  • Staff is also proposing a donation to the San

Mateo Credit Union (SMCU) Community Fund in the amount of $50,000

  • Earmarked specifically for small business support

via Renaissance Entrepreneurship Center (REC)

  • REC recently received the final $200K in small

business grant funds from San Mateo Strong to disburse to their clients in San Mateo County

SMCU Community Fund Donation

slide-34
SLIDE 34

34

  • Since 2007, Renaissance’s East Palo Alto provided
  • comprehensive small business training and support services
  • lower-income English and Spanish speaking women and men, the overwhelming majority of

whom have overcome significant obstacles to launch and grow their own businesses.

  • Over the past two years REC has served 195 small business through San Mateo County
  • Expanding on the funds received from San Mateo Strong will allow REC to increase their
  • utreach and assistance to these vulnerable businesses.
  • REC grants would be targeted in the areas of:
  • Training and guidance to build resiliency, pivot operations, reestablish revenues

and/or re-open

  • Providing funding for purchasing/upgrading technology (noting that lack of technology is often

the reason that these businesses are not able to access available resources)

  • Acquiring COVID-19 precaution supplies (PPE) and safety remodeling, building operational

capacities and pivoting business models to meet new customer preferences

Renaissance Entrepreneurship Center (REC)

slide-35
SLIDE 35

35

  • Maximum total of $1.55 million
  • Cash reserves will remain well above required policy level

Financial Impact

slide-36
SLIDE 36

Questions?

slide-37
SLIDE 37

37

  • 6. Consideration of New Member Opportunity and

Proposed JPA Amendments (Discussion/Direction/Action)

Regular Agenda

slide-38
SLIDE 38

38

1) Consider new community inclusion subcommittee’s recommendation to

  • ffer fully integrated membership as the preferred governance/

management option for new member agencies.

2) Pending results of technical study, direct staff at the subcommittee’s

authorization to offer membership to the City of Los Banos for potential 2022 enrollment.

3) Consider proposed amendments to PCE’s JPA Agreement and direct staff

to send to member agencies for required 30-day notice period.

RECOMMENDED BOARD ACTIONS

slide-39
SLIDE 39

39

1) Wright Solar Groundbreaking – October 2018 2) Presentation to Los Banos City Council –

September 2019

3) Wright Solar Project started delivering power –

January 2020

4) Los Banos City Council votes to conduct technical study –

June 2020

Activities to Date

slide-40
SLIDE 40

40

A) Fully Integrated Membership B) Modified Membership with Separate Accounting and

Programs

C) Outsourced/Contract Service Model

Analyzed approaches, benefits, challenges and risks within 14 different operational considerations (see options matrix in packet). Option A is recommended by the subcommittee as the lowest risk, least administrative impact option while conferring considerable benefits to PCE and its potential new members.

Governance/Management Options

slide-41
SLIDE 41

41

1) Study Author: MRW & Associates, Oakland, CA 2) Los Banos’ load would represent 4.7% of PCE’s overall load with the addition of

~15,000 new customers.

3) Scope of study considers Los Banos’ impact on PCE’s load/finances and also

considers Los Banos as its own CCA (should they pursue CCA on their own)

4) Weekly calls with MRW to define and validate study assumptions, test financial

modeling and receive updates on analysis.

5) Study to be complete by early September 6) So far, analysis shows that Los Banos will have little impact on PCE load projections

  • r finances; thus, their inclusion could be considered “net neutral” from a

revenue/expense perspective.

7) Results of study will be presented to Los Banos City Council on 9/16 and to PCE

Board on 9/26

Los Banos Technical Study

slide-42
SLIDE 42

42

Administrative language amendments plus 3 substantive amendments to provide additional process detail for new members and risk reduction for PCE. Researched several CCA JPA Agreements and practices pertaining to the addition of new members PCE’s proposed amendments are based on language found in MCE Clean Energy’s JPA Agreement which has expanded its membership multiple times Proposed Amended Sections:

  • Section 4.3 Addition of Parties;
  • Section 4.3.1 Continuing Participation;
  • Section 4.3.2 Termination By Additional Parties

Proposed JPA Amendments

slide-43
SLIDE 43

43

Please refer to detailed timeline in Board packet. Highlights Include 8/27 Board Action - provisional approvals to proceed with new membership and post JPA amendments 9/16 Los Banos City Council – Study Presentation; move toward membership? 9/26 PCE Board – Study Presentation; move toward offering membership?

  • Oct. Los Banos and PCE Final Actions/Approvals

11/19 Los Banos Board Member Sworn In 12/17 Amended Implementation Plan Adopted; Submitted to CPUC

Next Steps/Timing

slide-44
SLIDE 44

44

  • 7. Approve Updated EV (Electric Vehicle) Incentives

Budget (Action)

Regular Agenda

slide-45
SLIDE 45

45

  • 8. Approve Local Government Fleets Program

(Action)

Regular Agenda

slide-46
SLIDE 46

Fleets Programs Proposal

August 27, 2020

slide-47
SLIDE 47

47

High-Level Roadmap: Transportation

Transportation

Personal cars Fleets/Shared

Renewables

Municipal Community

Building Electrification

New Existing

Load Shape

Analytics Storage Load Control, VGI

2018 | 2019 | 2020 | 2021 >>>

TRANSPORTATION ELECTRIFICATION Current

  • EV Ride & Drive Campaign (hiatus)
  • New EV Incentive Program
  • Low Income Used EV Program
  • EV Ready (EV Charging Infrastructure Program)

Pilots

  • Smart Charging
  • Low Power Charging

Forthcoming

  • Ride-Hailing Electrification
  • Curbside Charging Pilot
  • Local Gov Fleets
slide-48
SLIDE 48

48

Program: Fleet program, including Technical Assistance, Funding, and Vehicle to Building Resiliency Demonstration Request: Approval of the proposed Fleets Program Amount & Term: Up to $900,000 over 3 years, consisting of:

  • $350,000 – technical assistance
  • $300,000 – gap funding for fleet replacement projects
  • $250,000 – Vehicle to Building Resiliency Demonstration Project

Fleets Program: Request

slide-49
SLIDE 49

49

Proposed PCE Fleets Program

Trainings, site design and setup

Support

Gap funding assistance

Funding

Demonstration with local agency

V2B

$350K $300K $250K

slide-50
SLIDE 50

50

  • Open to public agencies and public-school districts
  • All on-road vehicle classes eligible
  • Partners must commit to replacing 5 vehicles minimum per

project site (schools exempted)

  • Low Carbon Fuel Standard (LCFS) credits must be delegated to

PCE

Eligibility Requirements

slide-51
SLIDE 51

51

Fleet Support Structure

Support

General: Total cost of ownership calculator (with PCE rates), workshops, events, grant education, contract resources, advising

Custom assistance

slide-52
SLIDE 52

52

Custom Fleet Support Structure

Support

  • 1. Project planning, cost estimates, design
  • 2. Grant application assistance
  • 3. Bid development or piggybacking assistance
  • 4. Construction management and closeout (if

necessary)

  • 5. EV charging station setup and energy

management ~2 projects per year, $40K - $80K per project

slide-53
SLIDE 53

53

  • Targeted gap-funding assistance
  • Additional incentive to schools
  • Can be used for EV chargers, EV incremental cost, installation, energy

management subscriptions, etc.

  • Light-duty vehicle demonstrations (e.g. electric class 1 truck)

Incentive structure, based on scale of unfunded project component*:

Fleet Funding ($300K)

Funding

Unfunded Project Scope Local Agencies Schools <$100K Up to 25% or $25K per project (whichever is less) Up to 50% or $50K per project (whichever is less) >$100K Up to 50% or $100K per project (whichever is less) * Net all other incentives and replacement depreciation

slide-54
SLIDE 54

54

Waste Agency. 5 refuse trucks and 5 DCFC

  • Installation: $100,000
  • EV chargers: $300,000
  • Trucks: $1,750,000

Total project cost = $2,150,000 Pre-PCE Incentives and Depreciation

  • PG&E: $95,000
  • HVIP: $750,000
  • Depreciation: $1,250,000

Unfunded project cost = $55,000 PCE Incentive (25% up to $25,000): $13,750 Remaining agency cost: $41,250

Fleet Funding Example

slide-55
SLIDE 55

55 Example – Waste Agency: 5 refuse trucks and 5 DC Fast Chargers PCE Costs: Incentives: $14K Planning: $40K

Fleet Funding Example

Funding

PG&E Incentive PCE Incentive Other Funds Waste Agency Funds Total Costs

To the meter installation $50K (est.) 100% covered $50K Behind the meter installation $50K $50K EV charging stations ($60K each) $14K $286K $300K Trucks ($350K each) $45K $750K (HVIP) $955K $1.75M Depreciation ($1.25M) Total $95K $14K $750K $41K $2.15M

slide-56
SLIDE 56

56

Demo at 1 local agency critical facility Goal: Understand cost/benefit of fleet vehicle to building (V2B) as a resiliency measure Scope:

  • Design and install support
  • Trial demonstrations
  • Evaluation

Components:

  • Vehicles (1-2 Leafs)
  • 1-2 EV charging stations
  • Installation

Vehicle to Building Resiliency Pilot ($250K)

slide-57
SLIDE 57

57

Vehicle to Building Resiliency Pilot ($250K)

Estimated Budget Vehicles (2 used Leafs) $40,000 EV charging stations $15,000 Design and Engineering $60,000 Installation $35,000 Project support and evaluation $100,000 Total $250,000

slide-58
SLIDE 58

58

Fleets Budget

FY21 FY22 FY23 Total

Technical Assistance $50K $150K $150K $350K Fleet Fund $150K $150K $300K V2B Demo $25K $225K $250K Total $75K $625K $300K $900K

slide-59
SLIDE 59

59

Program: Fleet program, including Technical Assistance, Funding, and Vehicle to Building Resiliency Demonstration Request: Approval of the proposed Fleets Program Amount & Term: Up to $900,000 over 3 years, consisting of:

  • $350,000 – technical assistance
  • $300,000 – gap funding for fleet replacement projects
  • $250,000 – Vehicle to Building Resiliency Demonstration Project

Fleets Program: Request

slide-60
SLIDE 60

Backup Slides

slide-61
SLIDE 61

61

School District: 5 school buses and 5 DC Fast Chargers

  • Installation: $100,000
  • EV chargers: $300,000
  • Buses: $2,000,000

Total project cost = $2,400,000 Pre-PCE Incentives and Depreciation

  • PG&E: $215,000
  • CA Air Resources Board*: $1,100,000
  • Depreciation: $800,000

Unfunded project cost = $285,000 PCE Incentive (50% up to $100,000): $100,000 Remaining school district cost: $185,000 * Through the Hybrid and Zero-Emissions Truck and Bus Voucher Incentive Project (HVIP)

Fleet Funding Example: School

slide-62
SLIDE 62

62

Example – school project with 5 electric buses and 5 DCFC:

Proposed PCE Program

Funding

PG&E Incentive PCE Incentive Other Funds School District Funds Total Costs

To the meter installation $50K (est.) 100% covered $50K Behind the meter installation $20K $30K $50K EV charging stations ($60K each) $125K $100K $75K $300K Buses ($400K each) $20K $1.1M (HVIP) $880K $2M Depreciation ($800K) Total $215K $100K $1.1M 185K $2.4M PCE Costs Incentives: $100K Planning: $80K

slide-63
SLIDE 63

63

  • 9. Review Market Research Results (Discussion)

Regular Agenda

slide-64
SLIDE 64

64

  • 10. Approve Appointment of Citizen Advisory Committee

(CAC) Liaison and Alternate (Action)

Regular Agenda

slide-65
SLIDE 65

65

  • 11. Board Members’ Reports (Discussion)

Regular Agenda

slide-66
SLIDE 66

66

  • 1. PUBLIC EMPLOYEE PERFORMANCE

EVALUATION Title: Chief Executive Officer

Closed Session

slide-67
SLIDE 67

67

  • 2. CONFERENCE WITH LABOR

NEGOTIATORS

Closed Session

slide-68
SLIDE 68

68

  • 3. RECONVENE OPEN SESSION AND REPORT

ANY ACTION(S) TAKEN DURING CLOSED SESSION

Closed Session

slide-69
SLIDE 69

69

Regular Agenda

Adjourn