This presentation is for a project on US 12 in the St. Croix County - - PowerPoint PPT Presentation

this presentation is for a project on us 12 in the st
SMART_READER_LITE
LIVE PREVIEW

This presentation is for a project on US 12 in the St. Croix County - - PowerPoint PPT Presentation

This presentation is for a project on US 12 in the St. Croix County towns of Hudson and Warren. Rather than holding an in-person meeting, public involvement efforts have moved online as a precaution against COVID-19 based on the most current


slide-1
SLIDE 1

This presentation is for a project on US 12 in the St. Croix County towns of Hudson and Warren. Rather than holding an in-person meeting, public involvement efforts have moved online as a precaution against COVID-19 based on the most current health information from state, federal and local health departments. All meeting materials, including the handout with a comment form, are posted

  • n the design website for this project.

https://wisconsindot.gov/Pages/projects/by-region/nw/us12scc/default.aspx

If you have any questions, please contact WisDOT Project Supervisor, James Koenig at (715) 838-8391.

slide-2
SLIDE 2

US 12

Towns of Hudson and Warren County U to West Junction WIS 65

  • St. Croix County

Public Involvement Meeting

slide-3
SLIDE 3

Project Team

  • James Koenig
  • WisDOT Project Supervisor
  • Brett Hollister
  • WisDOT Consultant Project Manager
  • Ashley Seibel
  • WisDOT Consultant Real Estate Specialist
slide-4
SLIDE 4

Presentation Agenda

  • Project Location
  • Project Purpose and Need
  • Proposed Improvements
  • Construction Staging
  • Real Estate
  • Project Schedule
  • Contact Information
slide-5
SLIDE 5

Project Location

slide-6
SLIDE 6

Purpose and Need

  • Purpose
  • Rehabilitate the US 12 driving surface and drainage structures
  • Need
  • Deteriorated pavement
  • Deteriorated drainage structures
  • Deteriorated beam guard
  • Narrow paved shoulder
slide-7
SLIDE 7

Proposed Improvements

  • Resurface US 12 with asphalt pavement
  • Remove or replace beam guard
  • Widen the paved shoulder
  • Replace and clean out culverts
  • Install centerline and shoulder rumble strips
  • Replace concrete approaches and add flumes at the bridge

structure over the railroad tracks

  • Replace pavement marking
slide-8
SLIDE 8

Proposed Construction Staging

  • 2021 construction season (June-October)
  • US 12 closed to through traffic
  • Detour route: US 12 to I-94 to WIS 65
  • US 12 will be open to residences and businesses located within

the project limits

  • Temporary driveway closure will be coordinated with property
  • wners
slide-9
SLIDE 9

Detour Route

slide-10
SLIDE 10

Real Estate

  • Real estate acquisition for US 12 improvements
  • Strip takings, both permanent and temporary
  • Real estate acquisition process
  • Contact: Ashley Seibel, (715) 830-0544, ext. 205, or

ashley@rowpros.org

slide-11
SLIDE 11

Real Estate

slide-12
SLIDE 12

Project Schedule

  • Environmental Document

July 2019

  • Preliminary Plans

September 2019

  • Real Estate Plat

June 2020

  • Public Involvement Virtual Presentation

August 2020

  • Final Plans

November 2020

  • Construction

Summer 2021

slide-13
SLIDE 13

What we need from you

Share your concerns or comments

https://wisconsindot.gov/Pages/projects/by-region/nw/us12scc/default.aspx

Responses returned by Aug. 21, 2020

  • By email: HollisterB@AyresAssocites.com
  • By mail:
  • James Koenig

Wisconsin Department of Transportation 718 W. Clairemont Ave. Eau Claire, WI 54701

Thank you for your time

slide-14
SLIDE 14

Project Team

  • James Koenig
  • WisDOT Project Supervisor
  • (715) 838-8391
  • james.koenig@dot.wi.gov
  • Brett Hollister
  • WisDOT Consultant Project Manager
  • (715) 831-7545
  • HollisterB@AyresAssociates.com
  • Ashley Siebel
  • WisDOT Consultant Real Estate Specialist
  • (715) 830-0544 ext. 205
  • ashley@rowpros.org